Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Commercial Construction Permit

Address 342 SE TYRE RD
LAKE CITY, FL 32025
Parcel #: 10332-005
Acres: 19.81
Owner: Bancroft Performance Investments Llc,
Subdivision:
Zoning: MUD-I
Flood Zone: X
District: 4
Application #: 70233
Permit #: 000053358
Related Permit:
Submitted: Friday, April 4, 2025
Issued: Thursday, June 12, 2025
Expires: Tuesday, March 31, 2026
Completed:
Status: Final Review - Complete
Septic Release? No
Notes:
*APPROVED SITE PLAN SDP231201 EXP 1-25-2026. FFE INDICATED AT 100', ELEVATION CONFIRMATION REQUIRED ***CITY AVAILABILITY LETTER AND DRIVE FINAL REQUIRED PRIOR TO RELEASE OF POWER*** ****NO MECHANICAL INSPECTIONS TO BE GRANTED UNTIL SUBFORM REC'D-- 6.9.25 MG****
Job Details
Finished floor requirement
Fema map number 12023C0305D
Other job details: RECONNECTION/MH
Septic # (00-0000) or (X00-000) 11-0124
Type of RV Permit: Health Department Release Form
Electrical Code Edition Florida Building Code 2014 5th Edition & 2011 National Electrical Code
Review Notes
4/2/2025 Application pending.
4/4/2025 Application submitted by applicant.
4/4/2025 City of Lake City Utilities Notified.
4/7/2025 Point Review - Printed-Online Application
4/7/2025 Zoning Review - Reviewed
4/21/2025 Plan Review - Documents Required
4/25/2025 Plan Review - Plumbing Approved
4/25/2025 Plan Review - Mechanical Approved
4/25/2025 Plan Review - Electrical Approved
4/25/2025 Plan Review - Building Approved
4/25/2025 Plan Review - Reviewed
4/25/2025 Final Review - Processing
4/25/2025 Final Review - Documents Required
4/29/2025 Final Review - Documents Required
4/29/2025 Final Review - Documents Required
5/1/2025 Final Review - Documents Required
5/8/2025 Final Review - Documents Required
5/11/2025 Final Review - Documents Required
5/13/2025 Final Review - Documents Required
5/15/2025 Zoning Review - Reviewed
5/18/2025 Final Review - Documents Required
5/20/2025 Final Review - Documents Required
5/22/2025 Final Review - Documents Required
5/22/2025 Final Review - Documents Required
5/29/2025 Final Review - Documents Required
6/3/2025 Final Review - Documents Required
6/4/2025 Final Review - Documents Required
6/6/2025 Final Review - Documents Required
6/9/2025 Final Review - Documents Required
6/9/2025 Final Review - Reviewed
6/9/2025 Final Review - Payment Needed
6/12/2025 Final Review - Payment Needed
6/12/2025 Permit Issued
6/16/2025 Final Review - Complete
Contractors
Name/ Business License Title Role
Eric Bender
Greystone Construntion Company
CGC1534340 Cert. General Contractor
Cody Barrs
Barrs Plumbing Inc
CFC1427145 Plumbing Contractor Subcontractor
James B Seay
Miller Electric Company
EC13003061 Cert. Electrical Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Fire - Plan Review Cpt. Shane Overstreet 4/7/2025
Rescheduled 6/6/2025:Building - Slab Troy Crews 6/5/2025
Passed: Building - Slab Partial Truck Slab And Interior 2 Matts Of Steel Troy Crews 6/6/2025
Passed: Building - Slab Nw Section Troy Crews 6/9/2025
Passed: Electrical - 1st Underground Rough–In Troy Crews 6/9/2025
Passed: Plumbing/Gas - 1st Underground Rough–In Troy Crews 6/9/2025
Passed: Building - Slab Middle Of Building Interior Slab Troy Crews 6/11/2025
Passed: Building - Slab 3 Ramp Sections And More Interior Slab North East Side Troy Crews 6/12/2025
Passed: Building - Footer Done On 5-27-25 Footers Troy Crews 6/13/2025
Passed: Engineering - Setbacks Troy Crews 6/13/2025
Passed: Building - Masonry Wall Reinforcing Foundation Walls Partial Troy Crews 6/13/2025
Passed: Building - Masonry Wall Reinforcing Done 6-3-25 Foundation Walls Troy Crews 6/13/2025
Passed: Building - Slab Se Section Interior And Approach. Slab West Side Troy Crews 6/13/2025
Passed: Building - Slab Partial Interior And One Exterior Troy Crews 6/16/2025
Passed: Building - Slab Reminder Of Interior East End Of Building Troy Crews 6/17/2025
Passed: Building - Slab Tank Farm Slab 2 Foot With Two Mats Of Steel Troy Crews 6/20/2025
Passed: Building - Framing Bolts On Main Framing Troy Crews 7/11/2025
Rescheduled 8/14/2025:Plumbing/Gas - Water Pipe Troy Crews 8/13/2025
Passed: Plumbing/Gas - Water Pipe Partial 6 Inch Fire Line And 2 Inch Domestic Water Troy Crews 8/14/2025
Passed: Building - Framing Troy Crews 9/18/2025
Passed: Building - Insulation Troy Crews 9/18/2025
Passed: Building - Ext Strapping/Wall Sheathing Metal Shell Troy Crews 9/23/2025
Passed: Fire - Fire Rated Wall First Layer Of Two Hour Wall On Interior Of Building Troy Crews 9/23/2025
Passed: Plumbing/Gas - Water Pipe Potable Water And Fire Line Partial Troy Crews 9/23/2025
Passed: Plumbing/Gas - 2nd Rough-In Troy Crews 10/2/2025
Passed: Electrical - 2nd Rough-In Troy Crews 10/2/2025
Documents
File Name Date File Size