Passed: Private Provider - Private Provider Inspection
All Trades Rough Passed By Tim Hunt
notes: Conditional Approval. Water Piping In Attic Will Need To Be Insulated Per 2023 Fbc Plb 607.5, Fbc Energy R403.5.3. This Can Be Verified During Later Inspections.
Inspected by Private Provider Inspector