Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Right-of-Way Access/Driveway Permit
Address
Parcel #: 03001-108
Acres:
Owner: Forest Land Development, Llc
Subdivision:
Zoning: RSF-2
Flood Zone: X
District: 3
Application #: 70989
Permit #: 000053291
Related Permit:
Submitted: Tuesday, May 13, 2025
Issued: Monday, June 2, 2025
Expires: Saturday, November 29, 2025
Completed:
Status: Final Review - Complete
Septic Release? na
Notes:

Job Details
Is the access for commercial or residential use? Residential
Type of connection for access road Curb & Gutter
Type of construction of property Site Built Home
Normal vehicle usage: Automobiles
Estimated Number of Vehicle trips per day 4
County Road Type Paved
Standards Culvert installation shall conform to the approved site plan standards
Side Drain required Yes
Side Drain Size 18
Requirements Permanent An 18” storm pipe of approved material is required with a minimum length of 32 feet. 4” Concrete Pads shall be located on each mitered end section, and shall be 5’ wide by 7’ long. Culvert pipe should be placed 2 foot below edge of pavement.
Status Permanent
Fema map number 12023C0289D
Review Notes
5/13/2025 Application pending.
5/13/2025 Application submitted by applicant.
5/13/2025 Pending Public Works Application Approval
5/14/2025 Application Approved by Public Works
5/20/2025 Final Review - Payment Needed
5/21/2025 Pending initial driveway inspection A initial driveway inspection was automatically scheduled from payment.
6/2/2025 Permit Issued Permit #000053291 created and approved.
6/2/2025 Final Review - Complete
Contractors
Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Passed: Engineering - ROW Access/Driveway connects to county maintained road Chad Williams 5/13/2025
Passed: Engineering - Initial Driveway Beach, Garrett 5/22/2025