Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Roof Replacement or Repair Permit

Address 344 SW WILDWOOD CT
LAKE CITY, FL 32024
Parcel #: 09290-005
Acres: 5.49
Owner: King Sandra E,
Subdivision: Rosamaria Tract 1 Replat Unr
Zoning: A-3
Flood Zone: X
District: 5
Application #: 71265
Permit #: 000053250
Related Permit:
Submitted: Tuesday, May 27, 2025
Issued: Wednesday, May 28, 2025
Expires: Tuesday, November 25, 2025
Completed:
Status: Final Review - Complete
Septic Release? na
Notes:

Job Details
Finished floor requirement
Fema map number 12023C0395C
Type Roofing Job Replacement - Tear off Existing and Replace
Type of structure Mobile Home
Commercial or Residential Residential
Roof Area (for this job) Sq Ft 1400
No. of Stories 1
Roof Pitch 2:12 to 4:12
Is the existing roof being removed? Yes
Type of New Roofing Product Asphalt Shingles
Florida Product Approval Number 10124.1 GAF
Product Manufacturer gaf
Product Description shingles
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.) two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Ventilation: Ridge Vent
Flashing: Replace All
Drip Edge: Replace All
Valley Treatment: New Mineral Surface
Review Notes
5/27/2025 Application pending.
5/27/2025 Application submitted by applicant.
5/27/2025 Final Review - Payment Needed
5/28/2025 Permit Issued Permit # created and approved from payment.
5/28/2025 Final Review - Complete
Contractors
Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Passed: Re-Roof - In Progress In Progress Gary Pitzer 5/29/2025
Failed: Re-Roof - Final We Need Photos Show Your In Progress Work For The Repairs To Decayed Areas In The Photos That Have Been Submitted. Gary Pitzer 6/11/2025