Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Modular Building - Residential or Commercial Permit

Address 5815 NW LAKE JEFFERY RD
LAKE CITY, FL 32055
Parcel #: 02045-103
Acres: 5.08
Owner: Phelps Gene Thomas Jr,
Subdivision:
Zoning: A-3
Flood Zone: X
District: 1
Application #: 70463
Permit #: 000053151
Related Permit:
Submitted: Tuesday, April 22, 2025
Issued: Monday, May 19, 2025
Expires: Friday, September 12, 2025
Completed: Friday, September 12, 2025
Status: Completed
Septic Release? Yes
Notes:
**MFE = BOTTOM OF THE LOWEST BEAM MUST BE 1' ABOVE THE ROAD **OWNER BUILDER PERMIT, IF OWNER USES OUTSIDE ASSISTANCE MUST BE LICENSED BUILDING CONTRACTOR FOR MODULAR
Job Details
Elevation regulation Minimum Requirement
Finished floor requirement Bottom of lowest beam must be one foot above the road
Fema map number 12023C0280D
Setbacks Front 30'
Setback Side 1 25'
Setback Side 2 25'
Setbacks Rear 25'
Stories 1
Heated Area (Sqft) 981
Total Area (Sqft) 981
Dev Permit # F023-
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000) 25-0362
Modular frame type On frame
Use Type: Residential
Service Amps 200
Review Notes
4/22/2025 Application pending.
4/22/2025 Application submitted by applicant.
4/25/2025 Point Review - Processing
4/25/2025 Final Review - Processing
4/25/2025 Plan Review - Building Approved
4/25/2025 Plan Review - Reviewed
4/25/2025 Zoning Review - Documents Required
4/30/2025 Zoning Review - Documents Required
4/30/2025 Point Review - Reviewed
5/5/2025 Zoning Review - Documents Required
5/7/2025 Zoning Review - Reviewed
5/9/2025 Final Review - Documents Required
5/11/2025 Final Review - Documents Required
5/16/2025 Final Review - Processing
5/19/2025 Final Review - Payment Needed
5/19/2025 Permit Issued
Contractors
Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Passed: Modular - Permanent Power & Final All Requirements Met To Release Co-- 9.12.25 Mg Matt Forsyth 9/12/2025
Passed: Modular - Setbacks Matt Forsyth 9/12/2025
Passed: Modular - Footer Matt Forsyth 9/12/2025
Release to power company Ewilliams 9/26/2025
Septic Release Inspection Health Dept 9/26/2025