Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Storage Building Permit

Address 4140 SE COUNTY ROAD 18
LAKE CITY, FL 32025
Parcel #: 10641-001
Acres: 1.09
Owner: Bestoso Ellen Dwayne, Bestoso Michael Norman
Subdivision:
Zoning: A-3
Flood Zone: X
District: 4
Application #: 70411
Permit #: 000053143
Related Permit: Right-of-Way Access/Driveway: 000053044
Submitted: Wednesday, April 16, 2025
Issued: Monday, May 19, 2025
Expires: Saturday, November 15, 2025
Completed:
Status: Final Review - Complete
Septic Release? Yes
Notes:
*NON-HABITABLE STRUCTURE *NO SLAB, NO MEP *10' REAR SETBACK FOR ACCESSORY BUILDING ALLOWED
Job Details
Elevation regulation Minimum Requirement
Finished floor requirement Bottom of lowest beam must be one foot above the road
Fema map number 12023C0305D
Mobile Home is a: Double Wide
Year Built 2024
Width (Ft.In) 28
Length (Ft.In) 72
Driveway access to home: Existing Drive
Installation Decal # 119726
Septic # (00-0000) or (X00-000) X-CITY
Setbacks Front 25'
Setback Side 1 10'
Setbacks Rear 15'
Dev Permit # F023-
Setback Side 2 10'
Are you applying for a 5 year temporary permit? No
Serial # SOU018687ALAAC
Wind Zone? 2
Residential or Commercial Use? Residential
Service Amps 200
How many of bedrooms does this home have? 4
How many bathrooms does this home have? 3
Review Notes
4/16/2025 Application pending.
4/16/2025 Application submitted by applicant.
4/25/2025 Plan Review - Building Approved
4/25/2025 Plan Review - Reviewed
4/30/2025 Point Review - Processing
4/30/2025 Zoning Review - Documents Required
4/30/2025 Point Review - Reviewed
5/12/2025 Zoning Review - Reviewed
5/12/2025 Final Review - Documents Required
5/18/2025 Final Review - Payment Needed
5/19/2025 Permit Issued
5/19/2025 Final Review - Complete
Contractors
Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Septic Release Inspection Health Dept 5/14/2025
Documents
File Name Date File Size