Search pages and services on the county website.
Choose the colors you prefer.
Permit
348 SW LEGREE TERFORT WHITE, FL 32038
This is an owner-builder project.
Septic Release Inspection
Inspected by Health Dept
Passed: Building - Footer
Inspected by Anthony Aslan
Passed: Engineering - Setbacks
Appears Within Setbacks
Passed: Plumbing/Gas - 1st Underground Rough–In
Passed: Building - Slab
Cancelled: Building - Monolithic Slab
Cancelled: Engineering - Setbacks
Passed: Building - Monolithic Slab
Porches On House
Cancelled: Building - Strapping
Cancelled: Building - Wall Sheathing
Cancelled: Building - Framing
Passed: Building - Roof Decking
Passed: Building - Ext Strapping/Wall Sheathing
Need Pictures Of Gable Flat Straps
Cancelled: Building - Ext Strapping/Wall Sheathing
Passed: Building - Framing
Cancelled: Building - Window Attachment
Passed: Plumbing/Gas - 2nd Rough-In
Inspected by Christian Allen
Passed: Electrical - 2nd Rough-In
Passed: Mechanical - Rough In
Passed: Building - Insulation
Passed: Electrical - 1st Underground Rough–In
Passed: Building - Wall Sheathing
Passed: Building - Window Attachment
Passed: Electrical - Permanent Power
Release to power company
Passed: Building - Final