Permit Details

Permit Search

Permit

Roof Replacement or Repair

248 SW DUCKETT CT
LAKE CITY, FL 32024

Permit #
000053119
Application #
70949
Status Completed
  1. Submitted May 9, 2025
  2. Issued May 15, 2025
  3. Expires Dec 24, 2025
  4. Completed Jun 27, 2025

Property

Parcel #
02788-017
Owner
O'leary Clara, O'leary Michele E
Acres
1.09
Subdivision
—
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0270C
Type Roofing Job
Overlay with Metal
Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
barn behind
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
2679
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
No
Explain if not removing the existing roofing material?
Placing metal over Shingles
Type of New Roofing Product
Metal
Florida Product Approval Number
FL46679.01
Product Manufacturer
Mission Metals
Product Description
metal
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.)
a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof.
Ventilation:
Off-ridge Vent
Flashing:
Replace All
Drip Edge:
Replace All
Valley Treatment:
New Metal
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Final Review - Documents Required
  4. Final Review - Payment Needed
  5. Permit Issued
  6. Final Review - Complete
  7. Final Review - Complete

Contractors

  • Harry D Anderson Jr

    Southeastern Coatings & Waterproofing, Inc.

    License
    CCC1326114
    Title
    Roofing Contractor
    Role
    Contractor

Inspections

  1. May 16, 2025

    Passed: Re-Roof - In Progress

    Inspected by Matt Forsyth

  2. Jun 16, 2025

    Cancelled: Re-Roof - Final

    Inspected by Melissa Garber

  3. Jun 27, 2025

    Passed: Re-Roof - Final

    Inspected by Matt Forsyth

  4. Requested

    Re-Roof - Final

    Awaiting inspection