Permit Details

Permit Search

Permit

Mobile Home

21835 SW STATE ROAD 47
FORT WHITE, FL 32038

Permit #
000053112
Application #
70513
Status Completed
  1. Submitted Apr 24, 2025
  2. Issued May 14, 2025
  3. Expires Dec 14, 2025
  4. Completed Jul 2, 2025

Property

Parcel #
04232-005
Owner
Broc Bay Investments Llc,
Acres
0.85
Subdivision
—
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
Bottom of lowest beam must be one foot above the road
Fema map number
12023C0488C
Mobile Home is a:
Double Wide
Year Built
2025
Width (Ft.In)
28
Length (Ft.In)
46
Driveway access to home:
D.O.T. Permit
Installation Decal #
120826
Septic #
25-0371
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Dev Permit #
F023-
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
No
Serial #
CAV340FL25-24173AB
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200
How many of bedrooms does this home have?
3
How many bathrooms does this home have?
2

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Plan Review - Reviewed
  4. Point Review - Processing
  5. Point Review - Documents Required
  6. Point Review - Processing
  7. Zoning Review - Documents Required
  8. Zoning Review - Reviewed
  9. Final Review - Documents Required
  10. Final Review - Documents Required
  11. Final Review - Documents Required
  12. Final Review - Payment Needed
  13. Permit Issued
  14. Final Review - Complete

Contractors

  • Kyle Johnson

    Florida Mfg Foundations Llc

    License
    IH1126657
    Title
    Mh (dih) Dealer/installer
    Role
    Contractor
  • Glenn Whittington

    Whittington Electric Inc

    License
    EC13002957
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Timothy D Shatto

    Shatto Heating & Air, Inc.

    License
    CAC057875
    Title
    A/c Class B
    Role
    Subcontractor

Inspections

  1. Jun 13, 2025

    Passed: Engineering - D.O.T Final Driveway

    Inspected by Justin Sandlin

  2. Jun 17, 2025

    Passed: Mobile Home - Mobile Home Set-Up Final

    Need Final Septic Release Prior To Release Of Power And Co-- 6.18.25 Mg -- Rec'd 7.1.25 Mg

    Inspected by Anthony Aslan

  3. Jun 17, 2025

    Passed: Engineering - Setbacks

    Appears Within Setbacks

    Inspected by Anthony Aslan

  4. Jul 1, 2025

    Septic Release Inspection

    Inspected by Health Dept

  5. Jul 2, 2025

    Release to power company

    Ok To Release Power-- 7.2.25 Mg

    Inspected by Melissa Garber

  6. Jul 3, 2025

    Release to power company

    Inspected by Emaleigh Williams