Inspection |
Notes |
Performed By |
Date |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
5/14/2025 |
Passed: Building - Monolithic Slab |
|
Troy Crews |
5/20/2025 |
Passed: Engineering - Setbacks |
I Surveyor To Confirm Setbacks |
Troy Crews |
5/20/2025 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Troy Crews |
6/27/2025 |
Passed: Building - Framing |
|
Troy Crews |
6/27/2025 |
Passed: Building - Roof Decking |
|
Troy Crews |
6/27/2025 |
Passed: Building - Strapping |
Put Straps On Back Porch Post At Top |
Troy Crews |
6/27/2025 |
Passed: Building - Wall Sheathing |
|
Troy Crews |
6/27/2025 |
Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
6/27/2025 |
Passed: Mechanical - Rough In |
|
Troy Crews |
6/27/2025 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
6/27/2025 |
Passed: Building - Insulation |
|
Troy Crews |
7/9/2025 |
Failed: Electrical - Permanent Power |
Need Confirmation Of Ufer Ground Connection Seems To Be Behind This Siding May Need To Drive A Ground Rod |
Troy Crews |
8/4/2025 |
Passed: Electrical - Permanent Power |
Ground Rod Installed |
Troy Crews |
8/5/2025 |
Release to power company |
Ok To Release Power-- City Tap Inspection Required Prior To Final, Blower Door, & Termite Final Required Prior To Co-- 8.6.25 Mg |
Troy Crews |
8/5/2025 |
Submitted Power Release through FPL Portal |
|
Garber, Melissa |
8/6/2025 |
Passed: City of Lake City Utilities - Lake City Utilities Tap Inspection |
|
City Of Lake City Distribution And Collections Department |
9/4/2025 |
Passed: Building - Final |
Borate For Termite. All Requirements Met To Release Co-- 9.4.25 Mg |
Troy Crews |
9/4/2025 |