Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 424 SW SILVER PALM DR
LAKE CITY, FL 32024
Parcel #: 02731-077
Acres: 0.25
Owner: Adams Homes Of Northwest Florida, Inc,
Subdivision: Preserve At Laurel Lake Unit 1
Zoning: PRD
Flood Zone: X
District: 3
Application #: 70403
Permit #: 000053079
Related Permit:
Submitted: Tuesday, April 15, 2025
Issued: Sunday, June 22, 2025
Expires: Wednesday, February 18, 2026
Completed:
Status: Permit Reissued
Septic Release? Yes
Notes:
*MFE = 117.3' PER ENGINEER LETTER, SURVEYOR TO CONFIRM FFE AND SETBACKS *DRIVE FINAL REQUIRED PRIOR TO POWER RELEASE *CITY TAP INSPECTION REQUIRED PRIOR TO FINAL-- REQUEST THROUGH COUNTY
LAKE CITY UTLITY CUSTOMER SERVICE NOTES 05/01/25 The Utility Department approved the tap application for water and sewer services for this location. Locates must be obtained to ensure that the existing utility infrastructure is not damaged or obstructed.
Job Details
Finished floor requirement
Fema map number 12023C0390C
Type Roofing Job Overlay with Metal
Type of structure Mobile Home
Commercial or Residential Residential
Roof Area (for this job) Sq Ft 2600
No. of Stories 1
Roof Pitch 2:12 to 4:12
Is the existing roof being removed? No
Explain if not removing the existing roofing material? 1x4 purlins over shingles
Type of New Roofing Product Metal
Florida Product Approval Number fl10124.1.
Product Manufacturer capital
Product Description 26 g metal
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.) two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Ventilation: Ridge Vent
Flashing: Replace All
Drip Edge: Replace All
Valley Treatment: New Metal
Review Notes
4/15/2025 Application pending.
4/15/2025 Application submitted by applicant.
4/15/2025 City of Lake City Utilities Notified. City of Lake City Notified of Application within Utility Service Areas LC_GAS, LC_WATER, LC_SEWER.
4/16/2025 Point Review - Processing
4/22/2025 Plan Review - Plumbing Approved
4/22/2025 Plan Review - Mechanical Approved
4/22/2025 Plan Review - Electrical Approved
4/22/2025 Plan Review - Building Approved
4/22/2025 Plan Review - Reviewed
4/22/2025 Zoning Review - Processing
4/29/2025 Zoning Review - Reviewed NEEDED: *DRIVE APPROVAL-- PENDING PAYMENT, SEE APP #70386
4/29/2025 Final Review - Corrections Needed NEEDED: *DRIVE APPROVAL-- PENDING PAYMENT, SEE APP #70386
5/1/2025 Final Review - Reviewed
5/1/2025 Final Review - Payment Needed
5/9/2025 Final Review - Payment Needed
5/12/2025 Permit Issued Permit #000053079 created and approved.
6/22/2025 Permit Reissued Permit reissued to reflect updated information.
Contractors
Name/ Business License Title Role
William Adams
Adams Homes Of Northwest Florida Inc
CRC1330146 Cert. Residential Contractor
Shawn Reynolds
Ncf Electrical Services Llc
Liability Insurance Expired.
EC13011927 Cert. Electrical Subcontractor
Derrick L Williams
D L Williams Heating & Cooling Llc
CAC1816913 Class "b" A/c Contractor Subcontractor
Cody Barrs
Barrs Plumbing Inc
CFC1427145 Plumbing Contractor Subcontractor
Benjamin T Keeler
Keeler Roofing, Llc
CCC1330509 Cert. Roofing Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Plumbing/Gas - 1st Underground Rough–In Troy Crews 6/4/2025
Passed: Building - Monolithic Slab Troy Crews 6/9/2025
Passed: Engineering - Setbacks Surveyor To Confirm Setbacks Troy Crews 6/9/2025
Passed: Building - Ext Strapping/Wall Sheathing Troy Crews 7/7/2025
Passed: Building - Roof Decking Troy Crews 7/7/2025
Passed: Building - Strapping Troy Crews 7/7/2025
Cancelled: Building - Ext Strapping/Wall Sheathing Troy Crews 7/11/2025
Passed: Building - Framing Troy Crews 7/11/2025
Cancelled: Building - Strapping Troy Crews 7/11/2025
Cancelled: Building - Wall Sheathing Troy Crews 7/11/2025
Passed: Electrical - 2nd Rough-In Troy Crews 7/11/2025
Passed: Mechanical - Rough In Troy Crews 7/11/2025
Passed: Plumbing/Gas - 2nd Rough-In Troy Crews 7/11/2025
Passed: Plumbing/Gas - Tub Set/Shower Pan Troy Crews 7/11/2025
Passed: Building - Insulation Walls R-13, Vault R-30, Knee Walls R-19 Anthony Aslan 7/17/2025
Passed: Electrical - Permanent Power Troy Crews 8/22/2025
Release to power company Final Drive Rec'd 8.28.25-- Mg Troy Crews 8/22/2025
Submitted Power Release through FPL Portal Garber, Melissa 9/1/2025