Permit Details

Permit Search

Permit

Mobile Home

649 SE APRIL LN
LAKE CITY, FL 32025

Permit #
000053055
Application #
70170
Status Completed
  1. Submitted Apr 16, 2025
  2. Issued May 8, 2025
  3. Expires Mar 14, 2026
  4. Completed Sep 15, 2025

Property

Parcel #
09030-086
Owner
Dover Bobby,
Acres
0.89
Subdivision
—
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
Bottom of lowest beam must be one foot above the road
Fema map number
12023C0405C
Mobile Home is a:
Double Wide
Year Built
2025
Width (Ft.In)
24
Length (Ft.In)
44
Driveway access to home:
Existing Drive
Installation Decal #
115562
Septic #
25-0295
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Dev Permit #
F023-
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
No
Serial #
FL261-000-H-A106428AB
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200
How many of bedrooms does this home have?
2
How many bathrooms does this home have?
2

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Processing
  4. Plan Review - Reviewed
  5. Point Review - Documents Required
  6. Zoning Review - Reviewed
  7. Plan Review - Reviewed
  8. Final Review - Reviewed
  9. Final Review - Payment Needed
  10. Permit Issued
  11. Final Review - Complete

Contractors

  • Richard Rayborn

    Sams Mobile Home Service

    License
    IH1025436-1
    Title
    Mh Installer (ih)
    Role
    Contractor
  • Melvin R Lopez

    Advanced Electric & Security Llc

    License
    EC13005725
    Title
    Cert. Electrical
    Role
    Subcontractor

    County License Expired.

  • Austin Lopez

    Advanced Electric And Security Llc

    License
    CAC1820846
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License Expired.

Inspections

  1. Apr 11, 2025

    Septic Release Inspection

    Inspected by Health Dept

  2. Sep 5, 2025

    Failed: Mobile Home - Mobile Home Set-Up Final

    Lsd Bracket Not Attached duct Work On Ground Needs To Be Off Ground 4"

    Inspected by Anthony Aslan

  3. Sep 5, 2025

    Failed: Engineering - Setbacks

    Inspected by Anthony Aslan

  4. Sep 9, 2025

    Cancelled: Engineering - D.O.T Final Driveway

    This Access Does Not Belong To Fdot.

    Inspected by N/a

  5. Sep 15, 2025

    Cancelled: Certificate - Release Certificate

    Inspected by Aaslan

  6. Sep 15, 2025

    Passed: Mobile Home - Mobile Home Set-Up Final

    Corrections Made- Final Inspection Complete. Aa; Inspector Confirmed Old Mh Has Been Removed 9.15.25 Mg

    Inspected by Anthony Aslan

  7. Sep 15, 2025

    Release to power company

    Inspected by Anthony Aslan

  8. Sep 15, 2025

    Passed: Engineering - Setbacks

    Appears Within Setbacks

    Inspected by Anthony Aslan

  9. Sep 15, 2025

    Submitted Power Release through FPL Portal

    Inspected by Garber, Melissa

  10. Oct 1, 2025

    Release to power company

    Change Of Pwr Company

    Inspected by Ewilliams