Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Solar Power System Permit
Address 1262 SW BLUFF DR
FORT WHITE, 32038
Parcel #: 04236-039
Acres: 5.37
Owner: Zetrouer William C, Zetrouer Karen
Subdivision: Cedar Spring Shores
Zoning: ESA-2
Flood Zone: AE
District: 2
Application #: 70255
Permit #: 000053040
Related Permit:
Submitted: Friday, April 4, 2025
Issued: Wednesday, May 7, 2025
Expires: Monday, November 3, 2025
Completed:
Status: Permit Issued
Septic Release? na
Notes:

Job Details
PV Type Stand Alone PV System with Batteries- (DC system) separate electric permit not required.
Grounding N.E.C. Chapter 690
AC Options Exposed
AC Options (Cont..) In Conduit
Where are the panels mounted? Roof Mounted
Power Company Clay Electric
Residential or Commercial? Residential
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Fema map number 12023C0469C
Review Notes
4/4/2025 Application pending.
4/4/2025 Application submitted by applicant.
4/4/2025 Point Review - Printed-Online Application NEEDED * ARCHITECT/ENGINEER NAME AND ADDRESS CELL IS MISSING THE ADDRESS * PLEASE NOTE LAND OWNER AFFIDAVIT IS NOT REQUIRED FROM OWNER TO CONTRACTOR/COMPANY THAT IS WHY WE ASK FOR AN OWNER AND CONTRACTOR SIGNATURE PAGE * PLEASE DO NOT UPLOAD DOCS IN THE INCORRECT LOCATION IE: LETTER OF AUTH WAS UPLOADED UNDER OWNER DICSLOSURE STATEMENT - IT IS ALSO INCOMPLETE
5/2/2025 Zoning Review - Reviewed NEEDED * PLEASE NOTE LAND OWNER AFFIDAVIT IS NOT REQUIRED FROM OWNER TO CONTRACTOR/COMPANY THAT IS WHY WE ASK FOR AN OWNER AND CONTRACTOR SIGNATURE PAGE * PLEASE DO NOT UPLOAD DOCS IN THE INCORRECT LOCATION IE: LETTER OF AUTH WAS UPLOADED UNDER OWNER DICSLOSURE STATEMENT - IT IS ALSO INCOMPLETE
5/2/2025 Plan Review - Electrical Approved NEEDED * PLEASE NOTE LAND OWNER AFFIDAVIT IS NOT REQUIRED FROM OWNER TO CONTRACTOR/COMPANY THAT IS WHY WE ASK FOR AN OWNER AND CONTRACTOR SIGNATURE PAGE * PLEASE DO NOT UPLOAD DOCS IN THE INCORRECT LOCATION IE: LETTER OF AUTH WAS UPLOADED UNDER OWNER DICSLOSURE STATEMENT - IT IS ALSO INCOMPLETE
5/2/2025 Plan Review - Building Approved NEEDED * PLEASE NOTE LAND OWNER AFFIDAVIT IS NOT REQUIRED FROM OWNER TO CONTRACTOR/COMPANY THAT IS WHY WE ASK FOR AN OWNER AND CONTRACTOR SIGNATURE PAGE * PLEASE DO NOT UPLOAD DOCS IN THE INCORRECT LOCATION IE: LETTER OF AUTH WAS UPLOADED UNDER OWNER DICSLOSURE STATEMENT - IT IS ALSO INCOMPLETE
5/2/2025 Plan Review - Reviewed NEEDED * PLEASE NOTE LAND OWNER AFFIDAVIT IS NOT REQUIRED FROM OWNER TO CONTRACTOR/COMPANY THAT IS WHY WE ASK FOR AN OWNER AND CONTRACTOR SIGNATURE PAGE * PLEASE DO NOT UPLOAD DOCS IN THE INCORRECT LOCATION IE: LETTER OF AUTH WAS UPLOADED UNDER OWNER DICSLOSURE STATEMENT - IT IS ALSO INCOMPLETE
5/2/2025 Final Review - Corrections Needed NEEDED * PLEASE NOTE LAND OWNER AFFIDAVIT IS NOT REQUIRED FROM OWNER TO CONTRACTOR/COMPANY THAT IS WHY WE ASK FOR AN OWNER AND CONTRACTOR SIGNATURE PAGE * PLEASE DO NOT UPLOAD DOCS IN THE INCORRECT LOCATION IE: LETTER OF AUTH WAS UPLOADED UNDER OWNER DICSLOSURE STATEMENT - IT IS ALSO INCOMPLETE
5/6/2025 Final Review - Reviewed
5/6/2025 Final Review - Payment Needed
5/7/2025 Permit Issued Permit # created and approved from payment.
Contractors
Name/ Business License Title Role
Barry M Jacobson
Solar Impact Inc
Workers Comp & Employees Workers Comp Expired.
CVC56761 Cert. Solar Contractor
Richard Bella
Solar Impact Inc
Workers Comp & Employees Workers Comp Expired.
EC13012442 Cert. Electrical Subcontractor
Inspections
Inspection Notes Performed By Date