4/18/2025
|
Application pending.
|
4/18/2025
|
Application submitted by applicant.
|
4/21/2025
|
Point Review - Processing
NEED
* SEPTIC APPROVAL PAPERWORK
|
4/25/2025
|
Plan Review - Reviewed
NEED
* SEPTIC APPROVAL PAPERWORK
|
4/30/2025
|
Zoning Review - Processing
|
4/30/2025
|
Point Review - Reviewed
NEEDED
* UPDATED SITE PLAN TO REFLECT +35' FROM WETLANDS (SEE WETLANDS SITE PLAN)
* DRIVE APP TO BE COMPLETED
|
4/30/2025
|
Zoning Review - Documents Required
NEEDED
* DRIVE APP TO BE COMPLETED
ZONING NOTATION: PRIOR MH WAS NON-CONFORMING REGARDING THE WETLANDS 35' BUFFER. LOCATION OF NEW MH DOES NOT INCREASE THAT NON-CONFORMITY. OK AT 25' FROM WETLAND NOW. SITE PLAN APPROVED.
**THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE PROPOSED DEVELOPMENT. AN ENGINEER LETTER WILL BE REQUIRED TO ASSURE THAT THE MINIMUM FLOOR ELEVATION WILL BE SUFFICIANT TO AVOID POSSIBLE RISING WATERS OF THE AREA.
|
4/30/2025
|
Zoning Review - Reviewed
NEEDED
*DRIVE APPROVAL-- SEE APP #70594
ZONING NOTATION: PRIOR MH WAS NON-CONFORMING REGARDING THE WETLANDS 35' BUFFER. LOCATION OF NEW MH DOES NOT INCREASE THAT NON-CONFORMITY. OK AT 25' FROM WETLAND NOW. SITE PLAN APPROVED.
**THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE PROPOSED DEVELOPMENT. AN ENGINEER LETTER WILL BE REQUIRED TO ASSURE THAT THE MINIMUM FLOOR ELEVATION WILL BE SUFFICIANT TO AVOID POSSIBLE RISING WATERS OF THE AREA. -- PRIOR TO ISSUANCE
|
4/30/2025
|
Final Review - Documents Required
NEEDED
*DRIVE APPROVAL-- SEE APP #70594
ZONING NOTATION: PRIOR MH WAS NON-CONFORMING REGARDING THE WETLANDS 35' BUFFER. LOCATION OF NEW MH DOES NOT INCREASE THAT NON-CONFORMITY. OK AT 25' FROM WETLAND NOW. SITE PLAN APPROVED.
**THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE PROPOSED DEVELOPMENT. AN ENGINEER LETTER WILL BE REQUIRED TO ASSURE THAT THE MINIMUM FLOOR ELEVATION WILL BE SUFFICIANT TO AVOID POSSIBLE RISING WATERS OF THE AREA. -- PRIOR TO ISSUANCE
|
4/30/2025
|
Zoning Review - Reviewed
NEEDED
*DRIVE APPROVAL-- SEE APP #70594
*PENDING ENGINEER LETTER
ZONING NOTATION: PRIOR MH WAS NON-CONFORMING REGARDING THE WETLANDS 35' BUFFER. LOCATION OF NEW MH DOES NOT INCREASE THAT NON-CONFORMITY. OK AT 25' FROM WETLAND NOW. SITE PLAN APPROVED.
|
4/30/2025
|
Final Review - Corrections Needed
NEEDED
*DRIVE APPROVAL-- SEE APP #70594
**ENGINEER LETTER RECEIVED
***ZONING NOTATION: PRIOR MH WAS NON-CONFORMING REGARDING THE WETLANDS 35' BUFFER. LOCATION OF NEW MH DOES NOT INCREASE THAT NON-CONFORMITY. OK AT 25' FROM WETLAND NOW. SITE PLAN APPROVED. ***
|
5/2/2025
|
Final Review - Payment Needed
***ZONING NOTATION: PRIOR MH WAS NON-CONFORMING REGARDING THE WETLANDS 35' BUFFER. LOCATION OF NEW MH DOES NOT INCREASE THAT NON-CONFORMITY. OK AT 25' FROM WETLAND NOW. SITE PLAN APPROVED. ***
|
5/2/2025
|
Permit Issued
Permit # created and approved from payment.
|