Permit Details

Permit Search

Permit

New Residential Construction

9393 SW COUNTY ROAD 240
LAKE CITY, FL 32024

Permit #
000052982
Application #
69820
Status Completed
  1. Submitted Mar 19, 2025
  2. Issued Apr 30, 2025
  3. Expires Jul 12, 2026
  4. Completed Jan 15, 2026

Property

Parcel #
03486-005
Owner
Delaney Jeffery M, Delaney Kimberly Anne
Acres
5.00
Subdivision
—
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0390C
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
2202
Total Area (Sqft)
2769
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
25-0237
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Status Cleared
  4. Point Review - Printed-Online Application
  5. Zoning Review - Reviewed
  6. Plan Review - Documents Required
  7. Plan Review - Documents Required
  8. Plan Review - Documents Required
  9. Plan Review - Corrections Needed
  10. Plan Review - Building Approved
  11. Plan Review - Electrical Approved
  12. Plan Review - Mechanical Approved
  13. Plan Review - Plumbing Approved
  14. Plan Review - Fuel/Gas Approved
  15. Plan Review - Reviewed
  16. Final Review - Processing
  17. Final Review - Reviewed
  18. Final Review - Payment Needed
  19. Final Review - Payment Needed
  20. Permit Issued

Contractors

  • Bryan Zecher

    Bryan Zecher Homes Inc

    License
    CBC1257343
    Title
    Building Contractor
    Role
    Contractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Donald R Hollingsworth

    Holly Electric Inc

    License
    EC13005429
    Title
    Electrical
    Role
    Subcontractor
  • Anthony R Franks

    Lane Heating & Air Llc

    License
    CAC1818631
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License Expired.

  • Daniel Byrd

    Byrds Eye Roofing Inc

    License
    CCC1332899
    Title
    Cert. Roofing
    Role
    Subcontractor

Inspections

  1. Mar 25, 2025

    Septic Release Inspection

    Inspected by Health Dept

  2. Jun 2, 2025

    Passed: Building - Footer

    Inspected by Troy Crews

  3. Jun 2, 2025

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  4. Jul 14, 2025

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Waste Pipe Only Water Supply Sleeve In Foundation Wall

    Inspected by Matt Forsyth

  5. Jul 28, 2025

    Passed: Building - Slab

    Nice Work

    Inspected by Matt Forsyth

  6. Sep 3, 2025

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  7. Sep 3, 2025

    Passed: Building - Wall Sheathing

    Inspected by Matt Forsyth

  8. Sep 30, 2025

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Gary Pitzer

  9. Sep 30, 2025

    Passed: Building - Framing

    Inspected by Gary Pitzer

  10. Sep 30, 2025

    Passed: Mechanical - Rough In

    Inspected by Gary Pitzer

  11. Sep 30, 2025

    Passed: Electrical - 2nd Rough-In

    Inspected by Gary Pitzer

  12. Oct 3, 2025

    Passed: Building - Insulation

    Foam Roof And Batted Walls

    Inspected by Gary Pitzer

  13. Nov 26, 2025

    Passed: Electrical - Permanent Power

    Inspected by Gary Pitzer

  14. Dec 1, 2025

    Release to power company

    Inspected by Gary Pitzer

  15. Jan 12, 2026

    Cancelled: Building - Final

    Inspected by Nanderson

  16. Jan 13, 2026

    Passed: Building - Final

    All Requirements Met To Release Co-- 1.15.26 Mg

    Inspected by Matt Forsyth

Documents