Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 143 SW MEADOWLANDS DR
LAKE CITY, FL 32024
Parcel #: 09617-228
Acres: 5.08
Owner: Arango Carlos Alberto, Ramirez Nany M
Subdivision: Meadowlands Phase 2
Zoning: A-3
Flood Zone: X
District: 4
Application #: 65389
Permit #: 000052961
Related Permit:
Submitted: Monday, May 20, 2024
Issued: Monday, November 17, 2025
Expires: Saturday, May 16, 2026
Completed:
Status: Permit Reissued
Septic Release? No
Notes:
ZONING: *MFE= 1' ABOVE THE ROAD
Job Details
Elevation regulation Minimum Requirement
Finished floor requirement One foot above the road
Fema map number 12023C0485C
This is the construction of a Other
Setbacks Front 30'
Setback Side 1 25'
Setback Side 2 25'
Setbacks Rear 25'
Stories 1
Heated Area (Sqft) 1894
Total Area (Sqft) 2880
Building Height 20
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family dwelling
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000) 24-0089
If Other, explain the use of the structure. House
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) Other (explain)
Sealed roof decking explanation for other option. part of metal building
Service Amps 50
Review Notes
5/15/2024 Application pending.
5/20/2024 Application submitted by applicant.
5/24/2024 Point Review - On Hold-Incomplete
6/17/2024 Zoning Review - Reviewed
6/24/2024 Plan Review - Contact the Building Dept
7/3/2024 Plan Review - Contact the Building Dept
8/15/2024 Plan Review - Documents Required
8/15/2024 Plan Review - Documents Required
8/28/2024 Plan Review - Documents Required
9/11/2024 Plan Review - Documents Required
10/16/2024 Plan Review - Contact the Building Dept
11/27/2024 Plan Review - Contact the Building Dept
12/4/2024 Plan Review - Documents Required
12/18/2024 Plan Review - Documents Required
1/6/2025 Plan Review - Documents Required
2/11/2025 Plan Review - Documents Required
3/3/2025 Plan Review - Documents Required
3/4/2025 Point Review - On Hold-Incomplete
3/18/2025 Point Review - Reviewed
3/18/2025 Plan Review - Documents Required
3/20/2025 Plan Review - Documents Required
3/24/2025 Plan Review - Documents Required
3/25/2025 Plan Review - Documents Required
4/1/2025 Plan Review - Plumbing Approved
4/1/2025 Plan Review - Mechanical Approved
4/1/2025 Plan Review - Electrical Approved
4/1/2025 Plan Review - Building Approved
4/1/2025 Plan Review - Reviewed
4/1/2025 Final Review - Documents Required
4/2/2025 Final Review - Documents Required
4/22/2025 Final Review - Documents Required
4/27/2025 Final Review - Documents Required
4/28/2025 Final Review - Reviewed
4/28/2025 Final Review - Payment Needed
4/29/2025 Permit Issued
11/17/2025 Permit Reissued
Contractors
Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Passed: Building - Footer Mono Slab Knee Compaction Test Prior To Pour Notified Owner He Is Responsible For Plumbing Troy Crews 6/20/2025
Passed: Engineering - Setbacks Troy Crews 6/20/2025
Passed: Building - Framing Metal Building Framework Troy Crews 8/27/2025
Documents