Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Roof Replacement or Repair Permit

Address 113 NW GREEN LN
LAKE CITY, FL 32055
Parcel #: 02346-039
Acres: 0.90
Owner: Sambey Edward J, Sambey Kristy A
Subdivision: Club View Park S/d
Zoning: RSF-2
Flood Zone: A
District: 3
Application #: 70537
Permit #: 000052945
Related Permit:
Submitted: Monday, April 28, 2025
Issued: Monday, April 28, 2025
Expires: Friday, May 16, 2025
Completed: Friday, May 16, 2025
Status: Completed
Septic Release? na
Notes:

Job Details
Finished floor requirement
Fema map number 12023C0280D
Type Roofing Job Overlay with Metal
Type of structure House
Commercial or Residential Residential
Roof Area (for this job) Sq Ft 3121.5
No. of Stories 1
Roof Pitch 2:12 to 4:12
Type of New Roofing Product Metal
Florida Product Approval Number fl36904.2
Product Manufacturer Tricounty metal
Product Description 29 guage
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.) Other (explain)
Ventilation: Ridge Vent
Flashing: Replace All
Drip Edge: Replace All
Valley Treatment: New Metal
Review Notes
4/28/2025 City of Lake City Utilities Notified. City of Lake City Notified of Application within Utility Service Areas LC_GAS, LC_WATER,.
4/28/2025 Permit Issued Permit #000052945 created and approved.
Contractors
Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Passed: Re-Roof - In Progress Troy Crews 4/29/2025
Passed: Re-Roof - Final Anthony Aslan 5/16/2025
Documents
File Name Date File Size