Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Roof Replacement or Repair Permit
Address 187 SW LAZY DAY CT
LAKE CITY, FL 32024
Parcel #: 00229-010
Acres: 1.64
Owner: Campbell Paul C, Campbell Debra H
Subdivision:
Zoning: A-3
Flood Zone: X
District: 2
Application #: 70410
Permit #: 000052900
Related Permit:
Submitted: Wednesday, April 16, 2025
Issued: Wednesday, April 16, 2025
Expires: Monday, October 27, 2025
Completed:
Status: Permit Issued
Septic Release? na
Notes:

Job Details
Type Roofing Job Overlay with Metal
Type of structure House
Commercial or Residential Residential
Roof Area (for this job) Sq Ft 2200
No. of Stories 1
Ventilation: Off-ridge Vent
Flashing: Replace All
Drip Edge: Replace All
Roof Pitch 2:12 to 4:12
Is the existing roof being removed? No
Explain if not removing the existing roofing material? overlay
Type of New Roofing Product Metal
Florida Product Approval Number 17992.1 r4
Product Manufacturer Capital metals
Product Description 29
Sealed roof decking options: (Must select an option.) Other (explain)
Sealed roof decking explanation for other option. Metal Overlay
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Fema map number 12023C0260C
Review Notes
4/16/2025 Permit Issued Permit #000052900 created and approved.
Contractors

This is an owner builder project.

Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Passed: Re-Roof - In Progress Metal Overlay Matt Forsyth 4/30/2025