Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Roof Replacement or Repair Permit
Address 113 SE BENNIE LN
LAKE CITY, FL 32025
Parcel #: 08355-309
Acres: 1.03
Owner: Anderson, Josh
Subdivision: Hidden Acres
Zoning: RR
Flood Zone: X
District: 4
Application #: 70253
Permit #: 000052832
Related Permit:
Submitted: Friday, April 4, 2025
Issued: Friday, April 4, 2025
Expires: Wednesday, April 30, 2025
Completed: Wednesday, April 30, 2025
Status: Completed
Septic Release? na
Notes:

Job Details
Type Roofing Job Overlay with Metal
Type of structure Mobile Home
Commercial or Residential Residential
Roof Area (for this job) Sq Ft 1116
No. of Stories 1
Ventilation: Ridge Vent
Flashing: Use Existing
Drip Edge: Replace All
Valley Treatment: Use Existing
Roof Pitch 2:12 to 4:12
Any cable and/or race-way wiring located on or within the roof assembly? No
Is the existing roof being removed? No
Explain if not removing the existing roofing material? overlaying with metal
Type of New Roofing Product Metal
Florida Product Approval Number 17992.1 R4
Product Manufacturer Capital Metal
Product Description Capital Rib 26-G Galvalume
Sealed roof decking options: (Must select an option.) Other (explain)
Sealed roof decking explanation for other option. Not removing current roof, overlaying with metal
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Fema map number 12023C0315C
Review Notes
4/3/2025 Application pending.
4/4/2025 Application submitted by applicant.
4/4/2025 City of Lake City Utilities Notified. City of Lake City Notified of Application within Utility Service Areas LC_WATER,.
4/4/2025 Final Review - Contact the Building Dept * COST OF CONSTRUCTION IS BELOW THE $5000 REQUIREMENT - PLEASE CALL 386-758-1008 TO CONFIRM IF YOU WOULD LIKE TO MOVE FORWARD * NOC IS NOT REQUIRED DUE TO UNDER $5,000 * ROOF PICS (OF THE INPROGRESS) BEFORE FINAL INSPECTION - YOU WILL UPLOAD THESE IN THE PORTAL UNDER MANAGE DOCUMENTS
4/4/2025 Final Review - Payment Needed * NOC IS NOT REQUIRED DUE TO UNDER $5,000 * ROOF PICS (OF THE INPROGRESS) BEFORE FINAL INSPECTION - YOU WILL UPLOAD THESE IN THE PORTAL UNDER MANAGE DOCUMENTS
4/4/2025 Permit Issued Permit # created and approved from payment.
Contractors

This is an owner builder project.

Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Passed: Re-Roof - Final Owner Builder Anthony Aslan 4/30/2025