Permit Details

Permit Search

Permit

Right-of-Way Access/Driveway

Address not listed

Permit #
000052818
Application #
70055
Status Completed
  1. Submitted Mar 31, 2025
  2. Issued Apr 3, 2025
  3. Expires Feb 26, 2029
  4. Completed Feb 27, 2026

Property

Parcel #
05784-004
Owner
Taylor Dion
Acres
0.21
Subdivision
—
Zoning
RSF/MH-2
Flood zone
X
District
1

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0305D
Standards
Culvert installation shall conform to the approved site plan standards
Requirements
An 18” storm pipe of approved material is required with a minimum length of 32 feet. 4” Concrete Pads shall be located on each mitered end section, and shall be 5’ wide by 7’ long
Status
Permanent
Type of connection for access road
Verify Existing Drive
Type of construction of property
Site Built Home
Normal vehicle usage:
Automobiles
Side Drain required
Yes
Side Drain Size (diameter in inches)
18
Study Required
No
Estimated Number of Vehicle trips per day
1
Is the access for commercial or residential use?
Residential
County Road Type
Paved

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Pending Public Works Application Approval
  4. Application Approved by Public Works
  5. Final Review - Payment Needed
  6. Pending initial driveway inspection
  7. Permit Issued

Contractors

No contractors are listed on this permit.

Inspections

  1. Mar 31, 2025

    Passed: Engineering - ROW Access/Driveway connects to county maintained road

    Inspected by Chad Williams

  2. Apr 2, 2025

    Failed: Engineering - Verify existing driveway

    No Driveway At This Location.

    Inspected by Beach, Garrett

  3. Apr 3, 2025

    Passed: Engineering - Initial Driveway

    Inspected by Smith, Blake

  4. Oct 1, 2025

    Passed: Engineering - Driveway Spot Check

    Nothing Being Done At This Time

    Inspected by Smith, Blake

  5. Feb 27, 2026

    Passed: Engineering - Final Driveway

    inspection Notes: Spoke With Mr. Taylor About Removing The Concrete Debris From Culver Pipe.

    Inspected by Beach, Garrett