| Passed: Engineering - ROW Access/Driveway connects to county maintained road |
|
Chad Williams |
3/31/2025 |
| Failed: Engineering - Verify existing driveway |
No Driveway At This Location. |
Beach, Garrett |
4/2/2025 |
| Passed: Engineering - Initial Driveway |
|
Smith, Blake |
4/3/2025 |
| Passed: Engineering - Driveway Spot Check |
Nothing Being Done At This Time |
Smith, Blake |
10/1/2025 |
| Passed: Engineering - Final Driveway |
inspection Notes: Spoke With Mr. Taylor About Removing The Concrete Debris From Culver Pipe. |
Beach, Garrett |
2/27/2026 |