Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Commercial Construction Permit

Address 149 SW WOOLSEY GLN
LAKE CITY, FL 32024
Parcel #: 02719-000
Acres: 7.12
Owner: Woods Project Llc,
Subdivision:
Zoning: CI
Flood Zone: X
District: 3
Application #: 68470
Permit #: 000052789
Related Permit:
Submitted: Thursday, December 5, 2024
Issued: Wednesday, April 2, 2025
Expires: Tuesday, January 6, 2026
Completed:
Status: Permit Issued
Septic Release? No
Notes:
*SDP2216 *SHELL BUILDING ADDITIONAL PERMIT NEEDED FOR BUILDOUT
LAKE CITY UTLITY CUSTOMER SERVICE NOTES The City of Lake City does not provide utilities to this location.
Job Details
Finished floor requirement
Fema map number 12023C0382D
What is the power service for? Existing Site Built Home
Power Company Clay Electric
Septic # (00-0000) or (X00-000) x24
Electrical Code Edition 2020 National Electrical Code
Meter or Account: Meter
Meter or Account #: 154 737 547
Number of requested AMPS for electrical service: 200
Is the power service? Generator Install
Residential or Commercial? Residential
Review Notes
12/5/2024 Application pending.
12/5/2024 Application submitted by applicant.
12/5/2024 City of Lake City Utilities Notified. City of Lake City Notified of Application within Utility Service Areas LC_GAS,.
12/11/2024 Point Review - Processing NEED * TOTAL ESTIMATED COST * SEPTIC APPROVAL SITE PLAN * ROOF DECKING OPTIONS
1/27/2025 Zoning Review - Documents Required NEED * TOTAL ESTIMATED COST * SEPTIC APPROVAL SITE PLAN * ROOF DECKING OPTIONS DOT APPROVAL
2/7/2025 Zoning Review - Documents Required NEED * TOTAL ESTIMATED COST * SEPTIC APPROVAL SITE PLAN * ROOF DECKING OPTIONS DOT APPROVAL
3/10/2025 Plan Review - Documents Required NEED * SEPTIC APPROVAL SITE PLAN - WHAT WAS UPLOADED IS NOT WHAT WE NEEDED NEED DETAILED FLOOR PLAN ON PAVILLION, NEED TO ADDRESS ACCESSIBILITY ?
3/17/2025 Plan Review - Documents Required NEED * SEPTIC APPROVAL SITE PLAN - WHAT WAS UPLOADED IS NOT WHAT WE NEEDED NEED NEW SINGLE STORY PLANS UPLOADED AS PER CONTRACTOR
3/19/2025 Plan Review - Documents Required NEEDED: *COMMERCIAL PLANS CHECKLIST *MANUAL J & ENERGY CALCS (?) *PRODUCT APPROVAL CODES *ELECTRICAL/PLUMBING PLANS (PLAN REVIEWER TO DETERMINE IF NEEDED) *SUBCONTRACTOR FORM FOR ALL TRADES TO BE INCLUDED WITH GAME ROOM *NEED NEW SINGLE STORY PLANS UPLOADED AS PER CONTRACTOR
3/19/2025 Plan Review - Documents Required NEEDED: *COMMERCIAL PLANS CHECKLIST *PRODUCT APPROVAL CODES *NEED FOUNDATION PLAN FOR REVISED ONE STORY METAL BUILDING
3/20/2025 Plan Review - Documents Required NEEDED: *COMMERCIAL PLANS CHECKLIST *PRODUCT APPROVAL CODES *NEED FOUNDATION PLAN FOR REVISED ONE STORY METAL BUILDING
3/21/2025 Plan Review - Documents Required NEEDED: *COMMERCIAL PLANS CHECKLIST *PRODUCT APPROVAL CODES *NEED FOUNDATION PLAN FOR REVISED ONE STORY METAL BUILDING
3/24/2025 Plan Review - Documents Required NEEDED: *COMMERCIAL PLANS CHECKLIST *PRODUCT APPROVAL CODES *NEED FOUNDATION PLAN FOR REVISED ONE STORY METAL BUILDING
3/26/2025 Plan Review - Documents Required NEEDED: *COMMERCIAL PLANS CHECKLIST *PRODUCT APPROVAL CODES *NEED FOUNDATION PLAN FOR REVISED ONE STORY METAL BUILDING
3/31/2025 Plan Review - Documents Required NEEDED: *PRODUCT APPROVAL CODES APPROVED FOUNDATION ON SHEET S-3
3/31/2025 Plan Review - Documents Required NEEDED: *PRODUCT APPROVAL CODES APPROVED FOUNDATION ON SHEET S-3
4/1/2025 Zoning Review - Reviewed NEEDED: APPROVED FOUNDATION ON SHEET S-3
4/1/2025 Plan Review - Building Approved NEEDED: APPROVED FOUNDATION ON SHEET S-3
4/1/2025 Plan Review - Reviewed NEEDED: APPROVED FOUNDATION ON SHEET S-3
4/1/2025 Final Review - Processing NEEDED: APPROVED FOUNDATION ON SHEET S-3
4/2/2025 Final Review - Payment Needed APPROVED FOUNDATION ON SHEET S-3
4/2/2025 Permit Issued Permit #000052789 created and approved.
Contractors
Name/ Business License Title Role
Josh Sparks
Sparks Construction
CBC1252260 Building Contractor Contractor
Cody Barrs
Barrs Plumbing Inc
CFC1427145 Plumbing Contractor Subcontractor
Ralph W Laverdure
Rwl Roofing Llc
CCC1328590 Roofing Contractor Subcontractor
Benjamin L Sparks
Line Electric Company Llc
EC13009101 Cert. Electrical Subcontractor
Clinton G Wilson
Wilson Heat & Air Inc
CAC057886 Class B A/c Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Fire - Plan Review Cpt. Shane Overstreet 3/10/2025
Passed: Plumbing/Gas - 1st Underground Rough–In S.w.area Troy Crews 5/7/2025
Failed: Building - Slab Multiple Cave In Spots, Steel Has No Overlap In Corners Of Strip Footers, Matts Need Better Separation From Each Other Troy Crews 5/22/2025
Passed: Building - Monolithic Slab Items Corrected Troy Crews 5/22/2025
Passed: Engineering - Setbacks Troy Crews 5/22/2025
Passed: Electrical - 1st Underground Rough–In Ground Rods At Main Distribution And Underground Conduit Troy Crews 6/26/2025
Failed: Electrical - Service Upgrade Final No Perm Power Until Building Enclosed With Lockable Doors And Septic Final Troy Crews 6/30/2025
Passed: Electrical - Temporary Service Main Service To Be Used As Temporary Power Due To Power Company Configuration No Sub Panels Are Approved Until Each Have An Inspection Troy Crews 7/10/2025
Release to power company Troy Crews 7/10/2025
Documents
File Name Date File Size