Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Roof Replacement or Repair Permit

Address 255 NW FLEMING LN
WELLBORN, FL 32094
Parcel #: 00181-005
Acres: 45.30
Owner: Lang Michael Andrew & Charlene Revocable Living Trust Date March 21, 2011
Subdivision: Orange Creek Farms
Zoning: A-3
Flood Zone: X
District: 3
Application #: 69700
Permit #: 000052760
Related Permit:
Submitted: Friday, February 28, 2025
Issued: Monday, March 31, 2025
Expires: Friday, May 16, 2025
Completed: Friday, May 16, 2025
Status: Completed
Septic Release? na
Notes:

Job Details
Finished floor requirement
Fema map number 12023C0260C
Type Roofing Job Replacement - Tear off Existing and Replace
Type of structure House
Commercial or Residential Residential
Roof Area (for this job) Sq Ft 21
No. of Stories 1
Roof Pitch 4:12 or Greater
Is the existing roof being removed? Yes
Type of New Roofing Product Metal
Florida Product Approval Number 13-1211.05
Product Manufacturer snapclad
Product Description 24 ga. metal roof
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.) two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Ventilation: Off-ridge Vent
Flashing: Replace All
Drip Edge: Replace All
Valley Treatment: New Metal
Any cable and/or race-way wiring located on or within the roof assembly? No
Review Notes
2/28/2025 Application pending.
2/28/2025 Application submitted by applicant.
3/2/2025 Final Review - Corrections Needed NEEDED: *OWNER AND CONTRACTOR SIGNATURE PAGE TO BE SIGNED AS NAME IS STATED ON PA
3/31/2025 Final Review - Payment Needed
3/31/2025 Permit Issued Permit # created and approved from payment.
5/9/2025 Final Review - Complete
Contractors
Name/ Business License Title Role
John G Oneal
Oneal Roofing Company
CCC1329495 Roofing Contractor Contractor
Inspections
Inspection Notes Performed By Date
Passed: Re-Roof - In Progress Underlayment Is Confirmed Please Submit Venting An Affidavit For Final Matt Forsyth 4/14/2025
Passed: Re-Roof - Final Troy Crews 5/16/2025