3/6/2025
|
Application pending.
|
3/6/2025
|
Application submitted by applicant.
|
3/6/2025
|
City of Lake City Utilities Notified.
City of Lake City Notified of Application within Utility Service Areas LC_GAS, LC_WATER, LC_SEWER.
|
3/6/2025
|
Final Review - Documents Required
ZONING: STRUCTURE IS LOCATED IN A SPECIAL HAZARD FLOOD ZONE AND WILL REQUIRE AN ELEVATION CERTIFICATE PRIOR TO ISSUANCE OF THE PERMIT TO ESTABLISH THE GENERATOR IS ABOVE THE REQUIRED ELEVATION AS REQUIRED BY ARTICLE 8.5.2.3 OF COLUMBIA COUNTY LAND DEVELOPMENT REGULATIONS.
A FINISHED CONSTRUCTION ELEVATION CERTIFICATE WILL BE REQUIRED PRIOR TO FINAL INSPECTION.
|
3/14/2025
|
Final Review - Documents Required
ZONING: STRUCTURE IS LOCATED IN A SPECIAL HAZARD FLOOD ZONE AND WILL REQUIRE AN ELEVATION CERTIFICATE PRIOR TO ISSUANCE OF THE PERMIT TO ESTABLISH THE GENERATOR IS ABOVE THE REQUIRED ELEVATION AS REQUIRED BY ARTICLE 8.5.2.3 OF COLUMBIA COUNTY LAND DEVELOPMENT REGULATIONS.
A FINISHED CONSTRUCTION ELEVATION CERTIFICATE WILL BE REQUIRED PRIOR TO FINAL INSPECTION.
|
3/28/2025
|
Final Review - Payment Needed
ZONING: STRUCTURE IS LOCATED IN A SPECIAL HAZARD FLOOD ZONE AND WILL REQUIRE AN ELEVATION CERTIFICATE PRIOR TO ISSUANCE OF THE PERMIT TO ESTABLISH THE GENERATOR IS ABOVE THE REQUIRED ELEVATION AS REQUIRED BY ARTICLE 8.5.2.3 OF COLUMBIA COUNTY LAND DEVELOPMENT REGULATIONS.
A FINISHED CONSTRUCTION ELEVATION CERTIFICATE WILL BE REQUIRED PRIOR TO FINAL INSPECTION. 1ST EC WAS RECIEVED 3/28/2025 AND INDICATED THE EQUIPMENT TO BE AT 175.5 FT MINIMUM.
|
3/28/2025
|
Permit Issued
Permit # created and approved from payment.
|
7/1/2025
|
Zoning Review - Complete
Final EC received and OK. 7/1/2025 KAS
|