3/6/2025
|
Application pending.
|
3/6/2025
|
Application submitted by applicant.
|
3/10/2025
|
Point Review - Printed-Online Application
NEEDED:
*ARCHITECTURAL/STRUCTURAL PLANS
*CONTRACTOR LETTER OF AUTHORIZATION FOR BRITTANY DUNN
*ENERGY CODE AND MANUAL J FORMS
*FLOODPLAIN NOTICE TO OWNER
*PRODUCT APPROVAL CODES
*RESIDENTIAL CHECKLIST
*ENV HEALTH SIGNED SITE PLAN APPROVAL-- CONTACT 386.758.1058
*SITE PLAN WITH DIMENSIONS FROM PROPERTY LINES TO PROPOSED LOCATION
*SIGNED SUBCONTRACTOR FORM FOR ALL TRADES (MECHANICAL, ELECTRICAL, PLUMBING, & ROOFING)
*TRUSS ENGINEERING
|
3/10/2025
|
Point Review - Reviewed
NEEDED:
*ARCHITECTURAL/STRUCTURAL PLANS
*CONTRACTOR LETTER OF AUTHORIZATION FOR BRITTANY DUNN
*ENERGY CODE AND MANUAL J FORMS
*FLOODPLAIN NOTICE TO OWNER
*PRODUCT APPROVAL CODES
*RESIDENTIAL CHECKLIST
*ENV HEALTH SIGNED SITE PLAN APPROVAL-- CONTACT 386.758.1058
*SITE PLAN WITH DIMENSIONS FROM PROPERTY LINES TO PROPOSED LOCATION
*SIGNED SUBCONTRACTOR FORM FOR ALL TRADES (MECHANICAL, ELECTRICAL, PLUMBING, & ROOFING)
*TRUSS ENGINEERING
|
3/10/2025
|
Zoning Review - Documents Required
NEEDED:
*ARCHITECTURAL/STRUCTURAL PLANS
*CONTRACTOR LETTER OF AUTHORIZATION FOR BRITTANY DUNN
*ENERGY CODE AND MANUAL J FORMS
*FLOODPLAIN NOTICE TO OWNER
*PRODUCT APPROVAL CODES
*RESIDENTIAL CHECKLIST
*ENV HEALTH SIGNED SITE PLAN APPROVAL-- CONTACT 386.758.1058
*SITE PLAN WITH DIMENSIONS FROM PROPERTY LINES TO PROPOSED LOCATION
*SIGNED SUBCONTRACTOR FORM FOR ALL TRADES (MECHANICAL, ELECTRICAL, PLUMBING, & ROOFING)
*TRUSS ENGINEERING
|
3/10/2025
|
Plan Review - Documents Required
NEEDED:
*ARCHITECTURAL/STRUCTURAL PLANS
*CONTRACTOR LETTER OF AUTHORIZATION FOR BRITTANY DUNN
*ENERGY CODE AND MANUAL J FORMS
*FLOODPLAIN NOTICE TO OWNER
*PRODUCT APPROVAL CODES
*RESIDENTIAL CHECKLIST
*ENV HEALTH SIGNED SITE PLAN APPROVAL-- CONTACT 386.758.1058
*SITE PLAN WITH DIMENSIONS FROM PROPERTY LINES TO PROPOSED LOCATION
*SIGNED SUBCONTRACTOR FORM FOR ALL TRADES (MECHANICAL, ELECTRICAL, PLUMBING, & ROOFING)
*TRUSS ENGINEERING
|
3/10/2025
|
Zoning Review - On Hold-Incomplete
NEEDED:
*ARCHITECTURAL/STRUCTURAL PLANS
*CONTRACTOR LETTER OF AUTHORIZATION FOR BRITTANY DUNN
*ENERGY CODE AND MANUAL J FORMS
*FLOODPLAIN NOTICE TO OWNER
*PRODUCT APPROVAL CODES
*RESIDENTIAL CHECKLIST
*ENV HEALTH SIGNED SITE PLAN APPROVAL-- CONTACT 386.758.1058
*SITE PLAN WITH DIMENSIONS FROM PROPERTY LINES TO PROPOSED LOCATION
*SIGNED SUBCONTRACTOR FORM FOR ALL TRADES (MECHANICAL, ELECTRICAL, PLUMBING, & ROOFING)
*TRUSS ENGINEERING
|
3/14/2025
|
Zoning Review - Documents Required
*THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE PROPOSED DEVELOPMENT. AN ENGINEER LETTER WILL BE REQUIRED TO ASSURE THAT THE MINIMUM FLOOR ELEVATION WILL BE SUFFICIANT TO AVOID POSSIBLE RISING WATERS OF THE AREA.-- PRIOR TO ISSUANCE
|
3/14/2025
|
Plan Review - Private Provider
*THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE PROPOSED DEVELOPMENT. AN ENGINEER LETTER WILL BE REQUIRED TO ASSURE THAT THE MINIMUM FLOOR ELEVATION WILL BE SUFFICIANT TO AVOID POSSIBLE RISING WATERS OF THE AREA.-- PRIOR TO ISSUANCE
|
3/17/2025
|
Plan Review - Private Provider
*THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE PROPOSED DEVELOPMENT. AN ENGINEER LETTER WILL BE REQUIRED TO ASSURE THAT THE MINIMUM FLOOR ELEVATION WILL BE SUFFICIANT TO AVOID POSSIBLE RISING WATERS OF THE AREA.-- PRIOR TO ISSUANCE
|
3/18/2025
|
Zoning Review - Documents Required
*THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE PROPOSED DEVELOPMENT. AN ENGINEER LETTER WILL BE REQUIRED TO ASSURE THAT THE MINIMUM FLOOR ELEVATION WILL BE SUFFICIANT TO AVOID POSSIBLE RISING WATERS OF THE AREA.-- PRIOR TO ISSUANCE
|
3/18/2025
|
Zoning Review - On Hold-Incomplete
*THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE PROPOSED DEVELOPMENT. AN ENGINEER LETTER WILL BE REQUIRED TO ASSURE THAT THE MINIMUM FLOOR ELEVATION WILL BE SUFFICIANT TO AVOID POSSIBLE RISING WATERS OF THE AREA.-- PRIOR TO ISSUANCE
|
3/24/2025
|
Zoning Review - Reviewed
|
3/25/2025
|
Final Review - Reviewed
|
3/25/2025
|
Final Review - Payment Needed
|
3/25/2025
|
Permit Issued
Permit #000052699 created and approved.
|