Permit Details

Permit Search

Permit

New Residential Construction

302 SW CADENCE GLN
LAKE CITY, FL 32024

Permit #
000052688
Application #
69739
Status Completed
  1. Submitted Mar 11, 2025
  2. Issued Mar 24, 2025
  3. Expires Dec 23, 2025
  4. Completed Jul 21, 2025

Property

Parcel #
03001-106
Owner
Maronda Homes Llc Of Florida
Acres
1.14
Subdivision
Forest Cove
Zoning
RSF-2
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Engineers Elevation Letter
Finished floor requirement
1' above the crown of the road (102.8')
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0289D
This is the construction of a
Single Family Dwelling
Setbacks Front
25'
Setback Side 1
10'
Setback Side 2
10'
Setbacks Rear
15'
Stories
1
Heated Area (Sqft)
3130
Total Area (Sqft)
4126
Building Height
25
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
25-0124
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Point Review - Reviewed
  5. Zoning Review - Reviewed
  6. Plan Review - Plumbing Approved
  7. Plan Review - Mechanical Approved
  8. Plan Review - Electrical Approved
  9. Plan Review - Building Approved
  10. Plan Review - Reviewed
  11. Final Review - Processing
  12. Final Review - Reviewed
  13. Final Review - Payment Needed
  14. Permit Issued
  15. Final Review - Complete

Contractors

  • Adam Gaslin

    Maronda Homes Llc Of Florida

    License
    CRC1331630
    Title
    Cert. Residential
    Role
    Contractor

    County License & State License & Liability Insurance & Workers Comp Expired.

  • Paul K Coleman

    Colemans Plumbing Inc.

    License
    CFC1425624
    Title
    Certified Plumbing
    Role
    Subcontractor

    County License & State License & Employees Workers Comp Expired.

  • Benjamin T Keeler

    Keeler Roofing, Llc

    License
    CCC1330509
    Title
    Cert. Roofing
    Role
    Subcontractor
  • Ryan Hinote

    Nature Coast Electrical

    License
    EC13011934
    Title
    Cert. Electrical
    Role
    Subcontractor

    County License & State License & Liability Insurance & Workers Comp Expired.

  • Robert M Bounds

    Bounds Heating & Air Inc

    License
    CAC057642
    Title
    Class A A/c
    Role
    Subcontractor

Inspections

  1. Mar 31, 2025

    Passed: Electrical - 1st Underground Rough–In

    Inspected by Matt Forsyth

  2. Mar 31, 2025

    Passed: Electrical - Temporary Service

    Inspected by Matt Forsyth

  3. Mar 31, 2025

    Release to power company

    Inspected by Matt Forsyth

  4. Mar 31, 2025

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Matt Forsyth

  5. Apr 7, 2025

    Passed: Building - Monolithic Slab

    Inspected by Matt Forsyth

  6. Apr 7, 2025

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  7. May 21, 2025

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  8. May 21, 2025

    Passed: Building - Wall Sheathing

    Inspected by Matt Forsyth

  9. May 21, 2025

    Cancelled: Building - Fire Rated Wall

    Inspected by Troy Crews

  10. May 21, 2025

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Matt Forsyth

  11. May 21, 2025

    Passed: Building - Insulation

    Walls

    Inspected by Matt Forsyth

  12. May 21, 2025

    Passed: Building - Framing

    Inspected by Matt Forsyth

  13. May 21, 2025

    Passed: Mechanical - Rough In

    Inspected by Matt Forsyth

  14. May 21, 2025

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Inspected by Matt Forsyth

  15. Jun 4, 2025

    Passed: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  16. Jun 4, 2025

    Failed: Electrical - Permanent Power

    Work Not Complete

    Inspected by Matt Forsyth

  17. Jun 5, 2025

    Passed: Electrical - Permanent Power

    Final Drive(rec'd) Required Prior To Release Of Power-- 6.10.25 Mg

    Inspected by Matt Forsyth

  18. Jun 10, 2025

    Septic Release Inspection

    Inspected by Health Dept

  19. Jun 19, 2025

    Release to power company

    Final Septic Rec'd-- As-built Survey Required Prior To Co-- See Public Notes-- 6.19.25 Mg

    Inspected by Melissa Garber

  20. Jun 26, 2025

    Passed: Building - Final

    All Requirements Met, Chad Ok'd As-built-- 7.21.25 Mg

    Inspected by Matt Forsyth

Documents