Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 413 SW HIGHPOINT GLN
LAKE CITY, FL 32024
Parcel #: 03406-125
Acres: 3.39
Owner: Cady Micah J, Cady Alisha A
Subdivision: Rose Creek Plantation Phase 2
Zoning: A-3
Flood Zone: X
District: 5
Application #: 69862
Permit #: 000052680
Related Permit: Right-of-Way Access/Driveway: 000052628
Submitted: Monday, March 10, 2025
Issued: Monday, March 24, 2025
Expires: Thursday, October 23, 2025
Completed: Thursday, October 23, 2025
Status: Completed
Septic Release? Yes
Notes:
*MFE = 1' ABOVE THE ROAD *POWER MUST COME FROM MAIN DWELLING
Job Details
Elevation regulation Minimum Requirement
Finished floor requirement One foot above the road
Fema map number 12023C0383D
This is the construction of a Accessory Structure
Setbacks Front 30'
Setback Side 1 25'
Setback Side 2 25'
Setbacks Rear 25'
Stories 2
Heated Area (Sqft) 796
Total Area (Sqft) 1671
Building Height 25
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title accessory structure to main dwelling
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000) 25-0195
If Other, explain the use of the structure. accessory dwelling unit
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps 200
Review Notes
3/10/2025 Application pending.
3/10/2025 Application submitted by applicant.
3/10/2025 Point Review - Printed-Online Application
3/10/2025 Point Review - Reviewed
3/11/2025 Zoning Review - Reviewed
3/11/2025 Plan Review - Documents Required
3/14/2025 Plan Review - Building Approved
3/14/2025 Plan Review - Electrical Approved
3/14/2025 Plan Review - Mechanical Approved
3/14/2025 Plan Review - Plumbing Approved
3/14/2025 Plan Review - Reviewed
3/14/2025 Final Review - Documents Required
3/17/2025 Final Review - Documents Required
3/18/2025 Final Review - Documents Required
3/24/2025 Final Review - Reviewed
3/24/2025 Final Review - Payment Needed
3/24/2025 Permit Issued
Contractors
Name/ Business License Title Role
James Zuber
All Seasons Planning, Inc.
CGC1517099 General Contractor Contractor
Barry R Huber
Daybreak Dba Huber & Associates
Liability Insurance & Workers Comp Expired.
CCC050488 Roofing Contractor Subcontractor
Trever J Townsend
Townsend Electrical Contractors, Llc
Liability Insurance Expired.
ER13016105 Reg. Electrical Subcontractor
Anthony R Franks
Lane Heating & Air Llc
CAC1818631 Cert. A/c Class “b” Subcontractor
Brent Mccall
Suwannee Valley Plumbing Llc
CFC1432405 Cert. Plumbing Subcontractor
Inspections
Inspection Notes Performed By Date
Septic Release Inspection Health Dept 3/28/2025
Passed: Engineering - Setbacks Appears To Be With Site Plan Gary Pitzer 4/1/2025
Passed: Building - Footer 2#5 Rebar On Chairs And Wired, Electric Steel Bond In Place Gary Pitzer 4/1/2025
Passed: Plumbing/Gas - 1st Underground Rough–In No Cleanout, Water Under Pressure Gary Pitzer 4/17/2025
Passed: Building - Slab Steel, Plastic And Taped Gary Pitzer 4/22/2025
Passed: Building - Wall Sheathing Gary Pitzer 5/13/2025
Failed: Building - Roof Decking Roof Dryer In, No Access To Second Flood Steps In Progress Gary Pitzer 5/13/2025
Passed: Building - Roof Decking Gary Pitzer 5/14/2025
Passed: Building - Framing Gary Pitzer 5/15/2025
Passed: Building - Strapping Gary Pitzer 5/15/2025
Passed: Electrical - 2nd Rough-In Gary Pitzer 5/27/2025
Passed: Mechanical - Rough In Spit System ,lines And Drains Gary Pitzer 5/27/2025
Passed: Plumbing/Gas - 2nd Rough-In No Gas Gary Pitzer 5/27/2025
Passed: Plumbing/Gas - Tub Set/Shower Pan Gary Pitzer 5/27/2025
Passed: Building - Insulation Spray Foam Walls, Batt In Floor Anthony Aslan 6/20/2025
Passed: Building - Final All Requirements Met To Release Co Gary Pitzer 9/23/2025
Passed: Electrical - Permanent Power Gary Pitzer 9/23/2025
Release to power company Gary Pitzer 9/23/2025
Documents
File Name Date File Size