Inspection |
Notes |
Performed By |
Date |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
3/25/2025 |
Passed: Building - Monolithic Slab |
|
Troy Crews |
3/26/2025 |
Passed: Engineering - Setbacks |
Surveyor To Confirm Setbacks |
Troy Crews |
3/26/2025 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Troy Crews |
4/21/2025 |
Passed: Building - Roof Decking |
|
Troy Crews |
4/21/2025 |
Passed: Building - Wall Sheathing |
|
Troy Crews |
4/21/2025 |
Passed: Building - Strapping |
Put Gable Strapping On Ends For Upper Floor |
Troy Crews |
4/21/2025 |
Failed: Building - Framing |
Two Trusses No Clips Over Garage Area, Blocking At Seams In Osb Missing South Wall, Need Flat Strapping At Gable Ends To Tie Second Story 4 Ft. O.c. |
Troy Crews |
5/2/2025 |
Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
5/2/2025 |
Failed: Mechanical - Rough In |
Nail Plates Missing For Refrigerant Lines North Side Of House. |
Troy Crews |
5/2/2025 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
5/2/2025 |
Passed: Plumbing/Gas - Tub Set/Shower Pan |
|
Troy Crews |
5/2/2025 |
Passed: Mechanical - Rough In |
|
Troy Crews |
5/14/2025 |
Passed: Building - Framing |
|
Troy Crews |
5/14/2025 |
Passed: Building - Insulation |
|
Troy Crews |
5/21/2025 |
Passed: Electrical - Permanent Power |
|
Troy Crews |
7/2/2025 |
Release to power company |
Ok To Release Power-- 7.2.25 Mg |
Troy Crews |
7/2/2025 |
Submitted Power Release through FPL Portal |
|
Ward, Emaleigh C. |
7/3/2025 |
Passed: City of Lake City Utilities - Lake City Utilities Tap Inspection |
|
City Of Lake City Distribution And Collections Department |
7/14/2025 |
Passed: Building - Final |
Borate For Termite Final-- All Requirements Met To Release Co-- 8.27.25 Mg |
Troy Crews |
8/26/2025 |