Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Roof Replacement or Repair Permit

Address 329 SE HOLLY TER
LAKE CITY, FL 32025
Parcel #: 08631-110
Acres: 4.92
Owner: Nathanson, Jeffrey
Subdivision: Creek Run Plantation
Zoning: A-3
Flood Zone: X
District: 4
Application #: 69979
Permit #: 000052626
Related Permit:
Submitted: Tuesday, March 18, 2025
Issued: Tuesday, March 18, 2025
Expires: Monday, April 14, 2025
Completed: Monday, April 14, 2025
Status: Completed
Septic Release? na
Notes:

Job Details
Finished floor requirement
Fema map number 12023C0313D
Type Roofing Job Overlay with Metal
Type of structure House
Commercial or Residential Residential
Roof Area (for this job) Sq Ft 3056
No. of Stories 1
Roof Pitch 4:12 or Greater
Is the existing roof being removed? No
Explain if not removing the existing roofing material? Metal over existing roof
Type of New Roofing Product Metal
Florida Product Approval Number FL13768.1-R4
Product Manufacturer Agri Metal Supply
Product Description 29 GA Tuff Rib Roof Panel
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.) Other (explain)
Sealed roof decking explanation for other option. Existing roof will act as the sealed roof deck.
Ventilation: Ridge Vent
Flashing: Use Existing
Drip Edge: Use Existing
Valley Treatment: New Metal
Any cable and/or race-way wiring located on or within the roof assembly? No
Review Notes
3/18/2025 Application pending.
3/18/2025 Application submitted by applicant.
3/18/2025 Final Review - Payment Needed
3/18/2025 Permit Issued Permit # created and approved from payment.
Contractors
Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Passed: Re-Roof - In Progress Metal Over Anthony Aslan 4/4/2025
Passed: Re-Roof - Final Anthony Aslan 4/14/2025
Documents
File Name Date File Size