Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Roof Replacement or Repair Permit
Address 849 SW UNITY CT
FORT WHITE, FL 32038
Parcel #: 04317-135
Acres: 20.00
Owner: Larson Robin S Revocable Trust Dated February 26, 2025,
Subdivision: Lyn-dee Dairy Unr
Zoning: A-3
Flood Zone: X
District: 2
Application #: 69936
Permit #: 000052622
Related Permit:
Submitted: Friday, March 14, 2025
Issued: Tuesday, March 18, 2025
Expires: Wednesday, April 23, 2025
Completed: Wednesday, April 23, 2025
Status: Completed
Septic Release? na
Notes:

Job Details
Type Roofing Job Replacement - Tear off Existing and Replace
Type of structure House
Commercial or Residential Residential
Roof Area (for this job) Sq Ft 2600
No. of Stories 1
Ventilation: Ridge Vent
Flashing: Replace All
Drip Edge: Replace All
Valley Treatment: Use Existing
Roof Pitch 2:12 to 4:12
Any cable and/or race-way wiring located on or within the roof assembly? No
Is the existing roof being removed? Yes
Type of New Roofing Product Metal
Florida Product Approval Number FL4667901RI
Product Manufacturer MISSION METAL
Product Description 24 GAUGE
Sealed roof decking options: (Must select an option.) a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof.
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Fema map number 12023C0531C
Review Notes
3/14/2025 Application pending.
3/14/2025 Application submitted by applicant.
3/15/2025 Final Review - Documents Required NEEDED: *OWNER DISCLOSURE STATEMENT ***PRIOR TO INSPECTIONS*** RECORDED NOC
3/18/2025 Final Review - Payment Needed NEEDED: ***PRIOR TO INSPECTIONS*** RECORDED NOC
3/18/2025 Permit Issued Permit # created and approved from payment.
Contractors
Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Passed: Re-Roof - Final Owner Builder Anthony Aslan 4/23/2025