Roof Replacement or Repair
Permit
| Application #: | 69843 |
| Permit #: |
000052546 |
| Related Permit: |
|
| Submitted: | Monday, March 10, 2025 |
| Issued: | Tuesday, March 18, 2025 |
| Expires: | Friday, March 28, 2025 |
| Completed: | Friday, March 28, 2025 |
| Status: |
Completed |
| Septic Release? |
N/A |
Job Details
| Finished floor requirement |
|
| Fema map number |
12023C0485C |
| Type Roofing Job |
Replacement - Tear off Existing and Replace |
| Further Job Details (Explain if decking is being replaced and or Repairs are being done.) |
Remove existing metal roof. Replace with new metal roof. Replace decking as needed per FBC. **barn** |
| Type of structure |
Storage or Garage Building |
| Commercial or Residential |
Residential |
| Roof Area (for this job) Sq Ft |
4413 |
| No. of Stories |
2 |
| Roof Pitch |
2:12 to 4:12 |
| Is the existing roof being removed? |
Yes |
| Type of New Roofing Product |
Metal |
| Florida Product Approval Number |
FL36904.2 |
| Product Manufacturer |
Mission Metals |
| Product Description |
exposed fastener metal pane;s |
| Building Code Edition |
2023 Florida Building Code 8th Edition and 2020 National Electrical Code |
| Sealed roof decking options: (Must select an option.) |
a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof. |
| Ventilation: |
Unvented |
| Flashing: |
Replace All |
| Drip Edge: |
Replace All |
| Valley Treatment: |
New Metal |
| Any cable and/or race-way wiring located on or within the roof assembly? |
No |
Review Notes
| 3/10/2025 |
Application pending. |
| 3/10/2025 |
Application submitted by applicant. |
| 3/10/2025 |
Final Review - Payment Needed |
| 3/10/2025 |
Permit Issued |
| 3/18/2025 |
Permit Reissued |
Contractors
| Name / Business |
License |
Title |
Role |
Grady M Stephens Worthmann Roofing And Gutters
|
CCC1336120 |
Cert. Roofing |
Contractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Re-Roof - In Progress |
In Progress With And Nearly Complete Metal Roo Replacement |
Gary Pitzer |
3/20/2025 |
| Passed: Re-Roof - Final |
|
Gary Pitzer |
3/28/2025 |