| Passed: Building - Footer |
Put Ground Wire On Steel Prior To Pour |
Troy Crews |
6/17/2025 |
| Passed: Engineering - Setbacks |
|
Troy Crews |
6/17/2025 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
7/15/2025 |
| Passed: Building - Slab |
|
Anthony Aslan |
7/18/2025 |
| Passed: Building - Roof Decking |
|
Troy Crews |
8/6/2025 |
| Passed: Building - Wall Sheathing |
Complete Nailing Of Gable And Strapping And Send Pictures Prior To Cover Up |
Troy Crews |
8/6/2025 |
| Passed: Building - Strapping |
|
Troy Crews |
8/22/2025 |
| Passed: Building - Window Attachment |
|
Troy Crews |
8/22/2025 |
| Passed: Plumbing/Gas - 2nd Rough-In |
Nail Guards Missing In Several Place
cold Water Line In Contact With Kitchen Exhaust Piping
check On Re-inspection Of Mechanical |
Anthony Aslan |
9/24/2025 |
| Passed: Building - Framing |
Anchors Missing In Corners |
Anthony Aslan |
9/24/2025 |
| Failed: Mechanical - Rough In |
Exhaust Pipe Over Allowable Length |
Anthony Aslan |
9/24/2025 |
| Passed: Electrical - 2nd Rough-In |
Nail Guards Missing In Several Places |
Anthony Aslan |
9/24/2025 |
| Passed: Mechanical - Rough In |
|
Christian Allen |
9/26/2025 |
| Passed: Building - Insulation |
|
Christian Allen |
10/3/2025 |
| Passed: Electrical - Permanent Power |
Need Septic And Drive Final - Ew |
Christian Allen |
12/3/2025 |
| Release to power company |
|
Ewilliams |
12/22/2025 |
| Septic Release Inspection |
|
Health Dept |
12/22/2025 |
| Cancelled: Building - Final |
|
Tcrews |
2/25/2026 |
| Passed: Building - Final |
All Requirements Met To Release Co-- 3.3.26 Mg |
Christian Allen |
2/26/2026 |