Permit Details

Permit Search

Permit

Right-of-Way Access/Driveway

NW OLIVE GLN
,

Permit #
000052517
Application #
69286
Status Completed
  1. Submitted Feb 3, 2025
  2. Issued Mar 6, 2025
  3. Expires Feb 24, 2029
  4. Completed Feb 25, 2026

Property

Parcel #
04843-023
Owner
Cinera Group, Llc,
Acres
2.23
Subdivision
—
Zoning
RSF/MH-2
Flood zone
X
District
1

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0195D
Requirements
An 18” storm pipe of approved material is required with a minimum length of 32 feet. 4” Concrete Pads shall be located on each mitered end section, and shall be 5’ wide by 7’ long
Status
Permanent
Type of connection for access road
Verify Existing Drive
Type of construction of property
Mobile Home
Normal vehicle usage:
Automobiles
Side Drain required
Yes
Side Drain Size (diameter in inches)
18
Study Required
No
Estimated Number of Vehicle trips per day
4
Is the access for commercial or residential use?
Residential
County Road Type
Paved

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Pending Public Works Application Approval
  4. Application Approved by Public Works
  5. Final Review - Payment Needed
  6. Final Review - Payment Needed
  7. Final Review - Payment Needed
  8. Pending initial driveway inspection
  9. Permit Issued

Contractors

  • Barry E Maxwell

    Max-well Built Llc

    License
    —
    Title
    Framing
    Role
    Subcontractor

    County License & Liability Insurance & Workers Comp Expired.

  • Barry E Maxwell

    Max-well Built Llc

    License
    —
    Title
    Framing
    Role
    Subcontractor

    County License & Liability Insurance & Workers Comp Expired.

  • Barry E Maxwell

    Max-well Built Llc

    License
    —
    Title
    Framing
    Role
    Subcontractor

    County License & Liability Insurance & Workers Comp Expired.

Inspections

  1. Feb 3, 2025

    Passed: Engineering - ROW Access/Driveway connects to county maintained road

    Inspected by Chad Williams

  2. Mar 6, 2025

    Passed: Engineering - Initial Driveway

    Inspected by Smith, Blake

  3. Sep 2, 2025

    Passed: Engineering - Driveway Spot Check

    Mobile Home Is In Place

    Inspected by Smith, Blake

  4. Feb 20, 2026

    Failed: Engineering - Final Driveway

    inspection Notes: Pipe Hasn’t Been Installed

    Inspected by Smith, Blake

  5. Feb 23, 2026

    Failed: Engineering - Final Driveway

    inspection Notes: Driveway Isn’t Completed

    Inspected by Smith, Blake

  6. Feb 25, 2026

    Passed: Engineering - Verify existing driveway

    Inspected by Smith, Blake