Right-of-Way Access/Driveway
Permit
| Address |
NW OLIVE GLN , |
| Parcel #: |
04843-023 |
| Acres: | 2.23 |
| Owner: | Cinera Group, Llc, |
| Subdivision: | |
| Zoning: | RSF/MH-2 |
| Flood Zone: | X |
| District: | 1 |
| Application #: | 69286 |
| Permit #: |
000052517 |
| Related Permit: |
|
| Submitted: | Monday, February 3, 2025 |
| Issued: | Thursday, March 6, 2025 |
| Expires: | Wednesday, February 25, 2026 |
| Completed: | Wednesday, February 25, 2026 |
| Status: |
Completed |
| Septic Release? |
N/A |
Job Details
| Finished floor requirement |
|
| Fema map number |
12023C0195D |
| Requirements |
An 18” storm pipe of approved material is required with a minimum length of 32 feet. 4” Concrete Pads shall be located on each mitered end section, and shall be 5’ wide by 7’ long |
| Status |
Permanent |
| Type of connection for access road |
Verify Existing Drive |
| Type of construction of property |
Mobile Home |
| Normal vehicle usage: |
Automobiles |
| Side Drain required |
Yes |
| Side Drain Size |
18 |
| Study Required |
No |
| Estimated Number of Vehicle trips per day |
4 |
| Is the access for commercial or residential use? |
Residential |
| County Road Type |
Paved |
Review Notes
| 2/3/2025 |
Application pending. |
| 2/3/2025 |
Application submitted by applicant. |
| 2/3/2025 |
Pending Public Works Application Approval |
| 2/5/2025 |
Application Approved by Public Works |
| 2/10/2025 |
Final Review - Payment Needed |
| 2/17/2025 |
Final Review - Payment Needed |
| 2/24/2025 |
Final Review - Payment Needed |
| 3/5/2025 |
Pending initial driveway inspection |
| 3/6/2025 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Barry E Maxwell Max-well Built Llc
County License & Liability Insurance & Workers Comp Expired. |
|
Framing |
Subcontractor |
Barry E Maxwell Max-well Built Llc
County License & Liability Insurance & Workers Comp Expired. |
|
Framing |
Subcontractor |
Barry E Maxwell Max-well Built Llc
County License & Liability Insurance & Workers Comp Expired. |
|
Framing |
Subcontractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Engineering - ROW Access/Driveway connects to county maintained road |
|
Chad Williams |
2/3/2025 |
| Passed: Engineering - Initial Driveway |
|
Smith, Blake |
3/6/2025 |
| Passed: Engineering - Driveway Spot Check |
Mobile Home Is In Place |
Smith, Blake |
9/2/2025 |
| Failed: Engineering - Final Driveway |
inspection Notes: Pipe Hasn’t Been Installed |
Smith, Blake |
2/20/2026 |
| Failed: Engineering - Final Driveway |
inspection Notes: Driveway Isn’t Completed |
Smith, Blake |
2/23/2026 |
| Passed: Engineering - Verify existing driveway |
|
Smith, Blake |
2/25/2026 |