Roof Replacement or Repair
Permit
| Application #: | 69756 |
| Permit #: |
000052509 |
| Related Permit: |
|
| Submitted: | Tuesday, March 4, 2025 |
| Issued: | Wednesday, March 5, 2025 |
| Expires: | Tuesday, April 1, 2025 |
| Completed: | Tuesday, April 1, 2025 |
| Status: |
Completed |
| Septic Release? |
N/A |
Notes
PICS AND AFFIDAVIT REC'D
Job Details
| Finished floor requirement |
|
| Fema map number |
12023C0459C |
| Type Roofing Job |
Replacement - Tear off Existing and Replace |
| Further Job Details (Explain if decking is being replaced and or Repairs are being done.) |
Remove existing metal and replace with new 26G metal on 1x4 purlins on mobile home. |
| Type of structure |
Mobile Home |
| Commercial or Residential |
Residential |
| Roof Area (for this job) Sq Ft |
672 |
| No. of Stories |
1 |
| Roof Pitch |
2:12 to 4:12 |
| Is the existing roof being removed? |
Yes |
| Type of New Roofing Product |
Metal |
| Florida Product Approval Number |
30343.08-R3 |
| Product Manufacturer |
Premier Metal Roof MFG. |
| Product Description |
Exposed fastener, rib style panel. Panel coverage is nominally 36” with nominal rib height of 3/4” |
| Building Code Edition |
2023 Florida Building Code 8th Edition and 2020 National Electrical Code |
| Sealed roof decking options: (Must select an option.) |
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified. |
| Ventilation: |
Ridge Vent |
| Flashing: |
Replace All |
| Drip Edge: |
Replace All |
| Valley Treatment: |
New Metal |
| Any cable and/or race-way wiring located on or within the roof assembly? |
No |
Review Notes
| 3/4/2025 |
Application pending. |
| 3/4/2025 |
Application submitted by applicant. |
| 3/4/2025 |
Final Review - Payment Needed |
| 3/5/2025 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Derek King True Force Roofing
|
CCC1335679 |
Cert. Roofing |
Contractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Re-Roof - In Progress |
|
Matt Forsyth |
3/27/2025 |
| Passed: Re-Roof - Final |
|
Matt Forsyth |
4/1/2025 |