| Application #: | 69511 |
| Permit #: |
000052492 |
| Related Permit: |
911 Address Application: |
| Submitted: | Wednesday, February 19, 2025 |
| Issued: | Tuesday, March 4, 2025 |
| Expires: | Sunday, September 2, 2029 |
| Completed: | |
| Status: |
New address issued and ticket completed. |
| Septic Release? |
N/A |
| Finished floor requirement |
|
| Fema map number |
12023C0291D |
| Standards |
Culvert installation shall conform to the approved site plan standards |
| Requirements |
An 18” storm pipe of approved material is required with a minimum length of 32 feet. 4” Concrete Pads shall be located on each mitered end section, and shall be 5’ wide by 7’ long |
| Status |
Temporary |
| Type of connection for access road |
Rural Driveway |
| Type of construction of property |
Site Built Home |
| Normal vehicle usage: |
Automobiles |
| Side Drain required |
Yes |
| Side Drain Size (diameter in inches) |
18 |
| Study Required |
No |
| Estimated Number of Vehicle trips per day |
2 |
| Is the access for commercial or residential use? |
Residential |
| County Road Type |
Paved |
| 2/17/2025 |
Pending applicant completion and submission. |
| 2/19/2025 |
Application submitted by applicant. |
| 2/19/2025 |
Pending Public Works Application Approval |
| 2/28/2025 |
Application Approved by Public Works |
| 2/28/2025 |
Final Review - Payment Needed |
| 2/28/2025 |
Pending initial driveway inspection |
| 3/4/2025 |
Permit Issued |
| 4/3/2025 |
New address issued and ticket completed. |
| Name / Business |
License |
Title |
Role |
| Inspection |
Notes |
Performed By |
Date |
| Passed: Engineering - ROW Access/Driveway connects to county maintained road |
|
Chad Williams |
2/19/2025 |
| Passed: Engineering - Initial Driveway |
|
Smith, Blake |
3/3/2025 |
| Passed: Engineering - Driveway Spot Check |
Nothing Being Done On Lot At This Time |
Smith, Blake |
9/2/2025 |
| Passed: Engineering - Driveway Spot Check |
inspection Notes: Still Under Construction |
Smith, Blake |
9/3/2026 |