Permit Details

Permit Search

Permit

Additions

1545 SW CENTERVILLE AVE
FORT WHITE, FL 32038

Permit #
000052457
Application #
68781
Status Completed
  1. Submitted Jan 22, 2025
  2. Issued Feb 28, 2025
  3. Expires May 5, 2026
  4. Completed Nov 12, 2025

Property

Parcel #
03832-109
Owner
Kellner Reed W, Kellner Susan J
Acres
17.34
Subdivision
—
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
Meet existing structure
Fema map number
12023C0480C
Description of addition:
LIVING AREA
Select driveway access to property:
Existing Drive
Fire sprinklers?
No
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setback Rear
25'
Stories
2
Heated Area (Sqft)
3337
Total Area (Sqft)
4607
Total Estimated Cost
578000.00
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Dev Permit #
F023-
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic#
24-0913
Is this an addition for commercial or residential use?
Residential
Sealed roof decking options. (Must select one.)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Point Review - Reviewed
  5. Zoning Review - Reviewed
  6. Plan Review - Plumbing Approved
  7. Plan Review - Mechanical Approved
  8. Plan Review - Electrical Approved
  9. Plan Review - Building Approved
  10. Plan Review - Reviewed
  11. Final Review - Documents Required
  12. Final Review - Documents Required
  13. Final Review - Payment Needed
  14. Permit Issued

Contractors

  • Bryan Zecher

    Bryan Zecher Construction Inc

    License
    CBC054575
    Title
    Cert.building Contractor
    Role
    Contractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Donald R Hollingsworth

    Holly Electric Inc

    License
    EC13005429
    Title
    Electrical
    Role
    Subcontractor
  • Anthony R Franks

    Lane Heating & Air Llc

    License
    CAC1818631
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License Expired.

  • Daniel Byrd

    Byrds Eye Roofing Inc

    License
    CCC1332899
    Title
    Cert. Roofing
    Role
    Subcontractor

Inspections

  1. Mar 5, 2025

    Passed: Building - Footer

    Inspected by Matt Forsyth

  2. Mar 5, 2025

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  3. Apr 15, 2025

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Matt Forsyth

  4. Apr 25, 2025

    Failed: Building - Slab

    All Vertical Lap Bar Block Wall Missing

    Inspected by Matt Forsyth

  5. Apr 28, 2025

    Passed: Building - Slab

    Item Addressed

    Inspected by Matt Forsyth

  6. May 9, 2025

    Passed: Building - Lintel/Tie Beam

    Vertical Bar In Place For Continuation Of Block

    Inspected by Matt Forsyth

  7. May 9, 2025

    Passed: Building - Masonry Wall Reinforcing

    All Clean Outs Inspected

    Inspected by Matt Forsyth

  8. Jun 4, 2025

    Passed: Building - Lintel/Tie Beam

    Block And Bar Are In Place

    Inspected by Matt Forsyth

  9. Jun 4, 2025

    Passed: Building - Masonry Wall Reinforcing

    All Clean Outs Had Continuation Bar Too Lentil

    Inspected by Matt Forsyth

  10. Jul 10, 2025

    Passed: Building - Framing

    Inspected by Matt Forsyth

  11. Jul 24, 2025

    Passed: Building - Framing

    Temporary Railing

    Inspected by Matt Forsyth

  12. Jul 24, 2025

    Passed: Electrical - 2nd Rough-In

    Nail Plates

    Inspected by Matt Forsyth

  13. Jul 24, 2025

    Passed: Mechanical - Rough In

    Inspected by Matt Forsyth

  14. Jul 24, 2025

    Passed: Plumbing/Gas - 2nd Rough-In

    Shower Pan Installation Needed

    Inspected by Matt Forsyth

  15. Jul 31, 2025

    Passed: Building - Insulation

    All Walls All Floor Cavities Partial Ceiling

    Inspected by Matt Forsyth

  16. Sep 22, 2025

    Passed: Electrical - Permanent Power

    Inspected by Gary Pitzer

  17. Sep 22, 2025

    Release to power company

    Inspected by Gary Pitzer

  18. Sep 22, 2025

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    2nd Floor Shower Flooded

    Inspected by Gary Pitzer

  19. Oct 10, 2025

    Release to power company

    Rec'd Septic

    Inspected by Ewilliams

  20. Oct 10, 2025

    Septic Release Inspection

    Inspected by Health Dept

  21. Nov 6, 2025

    Passed: Building - Final

    Picture Of Condensate Line Minimum 12 Inches Away From The Wall Also Blower Door Test

    Inspected by Matt Forsyth

Documents