1/6/2025
|
Application pending.
|
1/7/2025
|
Application submitted by applicant.
|
1/27/2025
|
Point Review - Printed-Online Application
NEEDED:
*STUP APPROVAL (?)
*ENV HEALTH APPROVAL-- CONTACT 386.758.1058
|
1/27/2025
|
Point Review - Reviewed
NEEDED:
*STUP APPROVAL (?)
*ENV HEALTH APPROVAL-- CONTACT 386.758.1058
|
1/28/2025
|
Plan Review - Reviewed
NEEDED:
*STUP APPROVAL (?)
*ENV HEALTH APPROVAL-- CONTACT 386.758.1058
*DRIVEWAY APPROVAL
|
1/28/2025
|
Zoning Review - Corrections Needed
NEEDED:
*REVISIT SITE PLAN AND PROVIDE MORE ACCURATE DIMENSIONS-- SEE SITE PLAN (NOT APPROVED)
*ENV HEALTH APPROVAL-- CONTACT 386.758.1058
*DRIVEWAY APPROVAL
|
1/28/2025
|
Zoning Review - Reviewed
NEEDED:
*ENV HEALTH APPROVAL-- CONTACT 386.758.1058
*DRIVEWAY APPROVAL
**THERE IS A SIGNIFICANT DIFFERENCE BETWEEN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE HOME SITE. MFE = BOTTOM OF LOWEST BEAM TO BE 1' ABOVE THE ROAD OR AN ENGINEER LETTER WILL BE REQUIRED.
|
1/29/2025
|
Point Review - Reviewed
NEEDED:
*ENV HEALTH APPROVAL-- CONTACT 386.758.1058
*DRIVEWAY APPROVAL
**THERE IS A SIGNIFICANT DIFFERENCE BETWEEN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE HOME SITE. MFE = BOTTOM OF LOWEST BEAM TO BE 1' ABOVE THE ROAD OR AN ENGINEER LETTER WILL BE REQUIRED.
|
1/29/2025
|
Final Review - Documents Required
NEEDED:
*ENV HEALTH APPROVAL-- CONTACT 386.758.1058
*DRIVEWAY APPROVAL
**THERE IS A SIGNIFICANT DIFFERENCE BETWEEN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE HOME SITE. MFE = BOTTOM OF LOWEST BEAM TO BE 1' ABOVE THE ROAD OR AN ENGINEER LETTER WILL BE REQUIRED.
|
1/31/2025
|
Final Review - Documents Required
NEEDED:
*ENV HEALTH APPROVAL-- CONTACT 386.758.1058
**THERE IS A SIGNIFICANT DIFFERENCE BETWEEN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE HOME SITE. MFE = BOTTOM OF LOWEST BEAM TO BE 1' ABOVE THE ROAD OR AN ENGINEER LETTER WILL BE REQUIRED.
|
2/2/2025
|
Final Review - Documents Required
NEEDED:
*ENV HEALTH APPROVAL-- CONTACT 386.758.1058
**THERE IS A SIGNIFICANT DIFFERENCE BETWEEN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE HOME SITE. MFE = BOTTOM OF LOWEST BEAM TO BE 1' ABOVE THE ROAD OR AN ENGINEER LETTER WILL BE REQUIRED.
|
2/10/2025
|
Final Review - Payment Needed
**THERE IS A SIGNIFICANT DIFFERENCE BETWEEN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE HOME SITE. MFE = BOTTOM OF LOWEST BEAM TO BE 1' ABOVE THE ROAD OR AN ENGINEER LETTER WILL BE REQUIRED.
|
2/10/2025
|
Permit Issued
Permit # created and approved from payment.
|
3/13/2025
|
Point Review - Reviewed
**THERE IS A SIGNIFICANT DIFFERENCE BETWEEN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE HOME SITE. MFE = BOTTOM OF LOWEST BEAM TO BE 1' ABOVE THE ROAD OR AN ENGINEER LETTER WILL BE REQUIRED.
|