Permit Details

Permit Search

Permit

Mobile Home

439 NW PROCTOR GLN
LAKE CITY, FL 32055

Permit #
000052229
Application #
68634
Status Completed
  1. Submitted Dec 16, 2024
  2. Issued Jan 31, 2025
  3. Expires Sep 24, 2025
  4. Completed Apr 2, 2025

Property

Parcel #
01816-004
Owner
Pridgen Patrick C, Pridgen Ashton E
Acres
5.05
Subdivision
—
Zoning
A-3
Flood zone
X
District
1

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
Bottom of lowest beam must be one foot above the road
Fema map number
12023C0190D
Mobile Home is a:
Double Wide
Year Built
2025
Width (Ft.In)
28
Length (Ft.In)
52
Driveway access to home:
Private Driveway Permit
Installation Decal #
117043
Septic #
24-0903
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Dev Permit #
F023-
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
No
Serial #
FL261-000-H-B204966AB
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200
How many of bedrooms does this home have?
3
How many bathrooms does this home have?
2

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Point Review - Reviewed
  5. Zoning Review - Contact the Building Dept
  6. Zoning Review - Reviewed
  7. Plan Review - Reviewed
  8. Final Review - Processing
  9. Final Review - Payment Needed
  10. Permit Issued

Contractors

  • Justus G Lariccia

    J&j Homes And Services

    License
    IH1127039
    Title
    Mh Installer (ih)
    Role
    Contractor

    County License & State License Expired.

  • Timothy D Shatto

    Shatto Heating & Air, Inc.

    License
    CAC057875
    Title
    A/c Class B
    Role
    Subcontractor

Inspections

  1. Mar 25, 2025

    Septic Release Inspection

    Inspected by Health Dept

  2. Mar 28, 2025

    Certificate-Release Certificate

    Inspected by Troy Crews

  3. Mar 28, 2025

    Passed: Mobile Home - Mobile Home Set-Up Final

    Inspected by Troy Crews

  4. Mar 28, 2025

    Release to power company

    Inspected by Troy Crews

  5. Mar 28, 2025

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  6. Apr 2, 2025

    Release to power company

    Inspected by Melissa Garber