Permit Details

Permit Search

Permit

Roof Replacement or Repair

229 NW WILKS LN
LAKE CITY, FL 32055

Permit #
000052185
Application #
69163
Status Completed
  1. Submitted Jan 27, 2025
  2. Issued Jan 29, 2025
  3. Expires Sep 16, 2025
  4. Completed Mar 20, 2025

Property

Parcel #
02327-003
Owner
D R Nickelson & Company Inc
Acres
10.36
Subdivision
—
Zoning
I
Flood zone
X
District
3

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0280D
Type Roofing Job
Replacement - Tear off Existing and Replace
Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
Building #7
Type of structure
Commercial Building
Commercial or Residential
Commercial
Roof Area (for this job) Sq Ft
155
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
Yes
Type of New Roofing Product
Metal
Florida Product Approval Number
20147.1 R3
Product Manufacturer
CAPITAL METAL SUPPLY
Product Description
26 Ga. Capital PBR Roof Panel over open framing
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Ventilation:
Ridge Vent
Flashing:
Use Existing
Drip Edge:
Replace All
Valley Treatment:
New Metal
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. City of Lake City Utilities Notified.
  4. Final Review - Corrections Needed
  5. Final Review - Corrections Needed
  6. Final Review - Payment Needed
  7. Permit Issued

Contractors

No contractors are listed on this permit.

Inspections

  1. Feb 27, 2025

    Passed: Re-Roof - In Progress

    Inspected by Troy Crews

  2. Mar 20, 2025

    Passed: Re-Roof - Final

    Inspected by Troy Crews