Right-of-Way Access/Driveway
Permit
| Address |
, |
| Parcel #: |
04269-006 |
| Acres: | 29.31 |
| Owner: | Kohn Craig, Kohn Darryl |
| Subdivision: | |
| Zoning: | A-3 |
| Flood Zone: | X |
| District: | 2 |
| Application #: | 69128 |
| Permit #: |
000052177 |
| Related Permit: |
|
| Submitted: | Friday, January 24, 2025 |
| Issued: | Tuesday, January 28, 2025 |
| Expires: | Thursday, July 27, 2028 |
| Completed: | |
| Status: |
|
| Septic Release? |
N/A |
Job Details
| Finished floor requirement |
|
| Fema map number |
12023C0526C |
| Standards |
Culvert installation shall conform to the approved site plan standards |
| Requirements |
An 18” storm pipe of approved material is required with a minimum length of 32 feet. 4” Concrete Pads shall be located on each mitered end section, and shall be 5’ wide by 7’ long |
| Status |
Temporary |
| Type of connection for access road |
Rural Driveway |
| Type of construction of property |
Agricultural |
| Normal vehicle usage: |
Farm Equipment |
| Side Drain required |
Yes |
| Side Drain Size |
18 |
| Estimated Number of Vehicle trips per day |
2 |
| Is the access for commercial or residential use? |
Residential |
| County Road Type |
Paved |
Contractors
| Name / Business |
License |
Title |
Role |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Engineering - ROW Access/Driveway connects to county maintained road |
|
Chad Williams |
1/24/2025 |
| Passed: Engineering - Initial Driveway |
|
Smith, Blake |
1/28/2025 |
| Passed: Engineering - Driveway Spot Check |
The Driveway Is Being Used To Harvest Crops |
Smith, Blake |
7/28/2025 |