| Septic Release Inspection |
|
Health Dept |
1/10/2025 |
| Passed: Swimming Pool - Pool Steel and Ground |
|
Gary Pitzer |
2/4/2025 |
| Passed: Engineering - Setbacks |
Appears To Be Within Set Backs, No Lot Markers Visiable |
Gary Pitzer |
2/4/2025 |
| Passed: Electrical - Pool/Deck Bonding |
Deck Steel Bonded And Walls Fastened To Loop Wire, Long Tail To Future Equipment |
Gary Pitzer |
4/1/2025 |
| Passed: Swimming Pool - Pool Deck/Piping Pressure |
|
Gary Pitzer |
4/1/2025 |
| Failed: Swimming Pool - Pool Safety and Final |
Fence Requires Bonding To The Right Side Of Entry Gate And Also The Entry Gateh |
Gary Pitzer |
6/13/2025 |
| Passed: Certificate-Release Certificate |
|
Gary Pitzer |
6/16/2025 |
| Passed: Swimming Pool - Pool Safety and Final |
|
Gary Pitzer |
6/16/2025 |