11/14/2024
|
Application pending.
|
11/14/2024
|
Application submitted by applicant.
|
11/15/2024
|
Point Review - Printed-Online Application
NEEDED
* AUTHORIZATION FROM IS FROM KYLE JOHNSON NOT JACOB TROWELL
* ENVIRONMENTAL HEALTH APPROVAL
* DRIVE
|
11/19/2024
|
Zoning Review - Documents Required
NEEDED
* AUTHORIZATION FROM IS FROM KYLE JOHNSON NOT JACOB TROWELL
* ENVIRONMENTAL HEALTH APPROVAL
* DRIVE
ZONING: SFHA
* PROPOSED STRUCTURE IS LOCATED WITHIN THE SPECIAL FLOOD HAZARD AREA OF FLOOD ZONE AE. TWO ELEVATION CERTIFICATES WILL BE REQUIRED TO CONFIRM ELEVATION REQUIREMENTS NOTED WITHIN ARTICLE 8 OF COLUMBIA COUNTY LDR ARE MET. FEMA FIRM MAPPING INDICATES BFE OF 34.5' AND THE DFE WILL BE 35.5' #1 PRIOR TO ISSUANCE OF THE PERMIT A CONSTRUCTION-BASED ELEVATION CERTIFICATE IS REQUIRED, #2 A FINAL ELEVATION CERTIFICATE PRIOR TO PERMINANT POWER AND THE CO. FOR FRAMED CONSTRUCTION MEASURING THE BOTTOM OF THE LOWEST FLOOR JOIST OR BEAM.
*MECHANICAL SHALL ALSO BE ELEVATED ABOVE THE DFE.
*ELECTRIC SHALL BE WATERPROOFED TO DFE.
|
1/6/2025
|
Zoning Review - Reviewed
NEEDED
* AUTHORIZATION FROM IS FROM KYLE JOHNSON NOT JACOB TROWELL
ZONING: SFHA
* A FINAL ELEVATION CERTIFICATE PRIOR TO PERMINANT POWER AND THE CO.
|
1/7/2025
|
Plan Review - Reviewed
NEEDED
* AUTHORIZATION FROM IS FROM KYLE JOHNSON NOT JACOB TROWELL
ZONING: SFHA
* A FINAL ELEVATION CERTIFICATE PRIOR TO PERMINANT POWER AND THE CO.
|
1/17/2025
|
Final Review - Payment Needed
ZONING: SFHA
ZONING: BOTTOM OF THE BEAM TO BE 36' OR HIGHER ON FINAL ELEVATION CERTIFICATE REQUIRED PRIOR TO FINAL INSPECTION.
|
1/17/2025
|
Permit Issued
Permit # created and approved from payment.
|
3/26/2025
|
Zoning Review - Reviewed
ZONING: SFHA
ZONING: BOTTOM OF THE BEAM TO BE 36' OR HIGHER ON FINAL ELEVATION CERTIFICATE REQUIRED PRIOR TO FINAL INSPECTION.
FINAL EC PROVIDED 3-25-2025 SHOWS THE BOTTOM OF THE LOWEST BEAM OF THE MH IS BELOW THE REQUIRED BFE + 1 FT. CORRECTIONS NEEDED
|
4/10/2025
|
Zoning Review - Reviewed
ZONING: SFHA
ZONING: BOTTOM OF THE BEAM TO BE 35.5' OR HIGHER ON FINAL ELEVATION CERTIFICATE REQUIRED PRIOR TO FINAL INSPECTION.
FINAL EC PROVIDED 3-25-2025 SHOWS THE BOTTOM OF THE LOWEST BEAM OF THE MH IS BELOW THE REQUIRED BFE + 1 FT. CORRECTIONS NEEDED
FINAL EC RECEIVED AND APPROVED 4/10/2025
|