11/27/2024
|
Application pending.
|
11/27/2024
|
Application submitted by applicant.
|
12/3/2024
|
Point Review - Printed-Online Application
NEEDED
* ENVIRONMENTAL HEALTH SIGNED SITE PLAN
* DRIVE APPROVAL
|
12/5/2024
|
Zoning Review - Documents Required
NEEDED
* ENVIRONMENTAL HEALTH SIGNED SITE PLAN
* DRIVE APPROVAL
AE FLOOD ZONE WILL NEED PRE ELEVATION CERTIFICATE AND FINAL BOTTOM OF FRAME 1 FOOT ABOVE BASE FLOOD ELEVATION
|
12/16/2024
|
Zoning Review - Documents Required
NEEDED
* ENVIRONMENTAL HEALTH SIGNED SITE PLAN
AE FLOOD ZONE WILL NEED PRE ELEVATION CERTIFICATE AND FINAL BOTTOM OF FRAME 1 FOOT ABOVE BASE FLOOD ELEVATION
|
1/2/2025
|
Zoning Review - Documents Required
NEEDED
* ENVIRONMENTAL HEALTH SIGNED SITE PLAN
AE FLOOD ZONE WILL NEED PRE ELEVATION CERTIFICATE AND FINAL BOTTOM OF FRAME 1 FOOT ABOVE BASE FLOOD ELEVATION
|
1/7/2025
|
Zoning Review - Documents Required
NEEDED
* ENVIRONMENTAL HEALTH SIGNED SITE PLAN
AE FLOOD ZONE WILL NEED PRE ELEVATION CERTIFICATE AND FINAL BOTTOM OF FRAME 1 FOOT ABOVE BASE FLOOD ELEVATION
|
1/10/2025
|
Zoning Review - Reviewed
NEEDED
* ENVIRONMENTAL HEALTH SIGNED SITE PLAN
AE FLOOD ZONE * FINAL ELEVATION CERTIFICATE REQUIRED PRIOR TO PERMINANT POWER.
*BOTTOM OF FRAME 1 FOOT ABOVE BASE FLOOD ELEVATION OF 34' = 35' TO BOTTOM OF THE BEAM.
|
1/13/2025
|
Plan Review - Reviewed
NEEDED
* ENVIRONMENTAL HEALTH SIGNED SITE PLAN
AE FLOOD ZONE * FINAL ELEVATION CERTIFICATE REQUIRED PRIOR TO PERMINANT POWER.
*BOTTOM OF FRAME 1 FOOT ABOVE BASE FLOOD ELEVATION OF 34' = 35' TO BOTTOM OF THE BEAM.
|
1/16/2025
|
Final Review - Reviewed
NEEDED:
AE FLOOD ZONE * FINAL ELEVATION CERTIFICATE REQUIRED PRIOR TO PERMINANT POWER.
*BOTTOM OF FRAME 1 FOOT ABOVE BASE FLOOD ELEVATION OF 34' = 35' TO BOTTOM OF THE BEAM.
|
1/16/2025
|
Final Review - Payment Needed
NEEDED:
AE FLOOD ZONE * FINAL ELEVATION CERTIFICATE REQUIRED PRIOR TO PERMINANT POWER.
*BOTTOM OF FRAME 1 FOOT ABOVE BASE FLOOD ELEVATION OF 34' = 35' TO BOTTOM OF THE BEAM.
|
1/16/2025
|
Permit Issued
Permit # created and approved from payment.
|
4/17/2025
|
Zoning Review - Reviewed
NEEDED:
AE FLOOD ZONE * FINAL ELEVATION CERTIFICATE REQUIRED PRIOR TO PERMINANT POWER.
*BOTTOM OF FRAME 1 FOOT ABOVE BASE FLOOD ELEVATION OF 34' = 35' TO BOTTOM OF THE BEAM.
FINAL ELEVATION CERTIFICATE REQUIRED. 4-17-2025 A COPY OF THE CONSTRUCTION DRAWING ELEVATION CERTIFICATE WAS DROPPED OFF AGAIN.
|
4/22/2025
|
Zoning Review - Reviewed
NEEDED:
AE FLOOD ZONE
FINAL ELEVATION CERTIFICATE. RECEIVED 4-22-2025
|
5/2/2025
|
Point Review - Printed-Online Application
NEEDED:
AE FLOOD ZONE
FINAL ELEVATION CERTIFICATE. RECEIVED 4-25-2025
|