Status Completed
  1. Submitted Jan 2, 2025
  2. Issued Feb 16, 2026
  3. Expires Dec 20, 2026
  4. Completed Jun 25, 2026

Property

Parcel #
03117-156
Owner
Trent Giebeig Construction Inc.
Acres
0.53
Subdivision
Crosswinds Phase 2
Zoning
RSF-2
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Not yet released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0381D
This is the construction of a
Single Family Dwelling
Setbacks Front
25'
Setback Side 1
10'
Setback Side 2
10'
Setbacks Rear
15'
Stories
1
Heated Area (Sqft)
1712
Total Area (Sqft)
2404
Building Height
22
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
24-0840
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Point Review - Reviewed
  5. Zoning Review - Reviewed
  6. Plan Review - Documents Required
  7. Plan Review - Documents Required
  8. Plan Review - Documents Required
  9. Plan Review - Plumbing Approved
  10. Plan Review - Mechanical Approved
  11. Plan Review - Electrical Approved
  12. Plan Review - Building Approved
  13. Plan Review - Reviewed
  14. Final Review - Documents Required
  15. Final Review - Documents Required
  16. Final Review - Reviewed
  17. Final Review - Payment Needed
  18. Permit Issued
  19. Permit Renewed
  20. Permit Renewed
  21. Permit is within the City of Lake City service area
  22. Termite Treatment - Final was not accepted.

Contractors

  • Brian T Giebeig

    6trent Giebeig Construction,inc.

    License
    CRC1330693
    Title
    Residential Contractor
    Role
    Contractor
  • Everton D Ruddock

    D&s Lighting Inc

    License
    EC13003800
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Derrick L Williams

    D L Williams Heating & Cooling Llc

    License
    CAC1816913
    Title
    Class "b" A/c Contractor
    Role
    Subcontractor
  • Kenneth R Roche

    Ken Roche Plumbing Inc Dba Plumbing Now

    License
    CFC1426527
    Title
    Plumbing Contractor
    Role
    Subcontractor

Inspections

  1. Jan 28, 2025

    Passed: Engineering - Setbacks

    Appears To Be With Setbacks Of Project

    Inspected by Gary Pitzer

  2. Jan 28, 2025

    Passed: Building - Footer

    2 #5 Rebar On Chairs And Wired, Has Grounding Electrode Attached To Rebar

    Inspected by Gary Pitzer

  3. Feb 6, 2025

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Dwv, No Clean Out, No Waterlines

    Inspected by Gary Pitzer

  4. Feb 11, 2025

    Passed: Building - Slab

    Wire Still Plastic With Tape

    Inspected by Gary Pitzer

  5. Mar 3, 2025

    Passed: Electrical - Temporary Service

    Inspected by Gary Pitzer

  6. Mar 3, 2025

    Release to power company

    Inspected by Gary Pitzer

  7. Mar 11, 2025

    Passed: Building - Wall Sheathing

    Inspected by Gary Pitzer

  8. Mar 11, 2025

    Passed: Building - Roof Decking

    Inspected by Gary Pitzer

  9. Apr 8, 2025

    Passed: Mechanical - Rough In

    Inspected by Gary Pitzer

  10. Apr 8, 2025

    Passed: Plumbing/Gas - 2nd Rough-In

    Warter Under Pressure +70psi

    Inspected by Gary Pitzer

  11. Apr 8, 2025

    Passed: Building - Framing

    Inspected by Gary Pitzer

  12. Apr 8, 2025

    Passed: Electrical - 2nd Rough-In

    Inspected by Gary Pitzer

  13. Apr 10, 2025

    Passed: Building - Insulation

    Inspected by Gary Pitzer

  14. Jul 8, 2025

    Passed: Electrical - Permanent Power

    Need Driveway Final And Final Septic From City Prior To Co

    Inspected by Troy Crews

  15. Jul 8, 2025

    Release to power company

    Inspected by Troy Crews

  16. Jun 22, 2026

    Passed: City of Lake City Utilities - Lake City Utilities Tap Inspection

    Inspected by City Of Lake City Distribution And Collections Department

  17. Jun 23, 2026

    Passed: Building - Final

    *all Requirements Met To Release Co-- 6.25.26 Mg

    Inspected by Troy Crews

Documents