Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Generator Permit

Address 6953 SW COUNTY ROAD 242
LAKE CITY, FL 32024
Parcel #: 00384-012
Acres: 13.75
Owner: Leeson Timothy J
Subdivision: Buies Tract Unr
Zoning: A-3
Flood Zone: X
District: 2
Application #: 68970
Permit #: 000052066
Related Permit:
Submitted: Tuesday, January 14, 2025
Issued: Tuesday, January 14, 2025
Expires: Monday, March 17, 2025
Completed: Monday, March 17, 2025
Status: Completed
Septic Release? Yes
Notes:

Job Details
Elevation regulation Engineers Elevation Letter
Finished floor requirement 32" ABOVE ADJACENT GROUND
Fema map number 12023C0360C
In floodway N
Mobile Home is a: Double Wide
Year Built 2023
Width (Ft.In) 32
Length (Ft.In) 76
Driveway access to home: Existing Drive
Installation Decal # 92595
Special temporary use permit number: 2304-20
Septic # (00-0000) or (X00-000) 23-0376
Setbacks Front 30'
Setback Side 1 25'
Setbacks Rear 25'
Dev Permit # F023-
Setback Side 2 25'
Are you applying for a 5 year temporary permit? Yes
Serial # whc029918baab
Wind Zone? 2
Residential or Commercial Use? Residential
Review Notes
1/14/2025 Application pending.
1/14/2025 Application submitted by applicant.
1/14/2025 Final Review - Payment Needed
1/14/2025 Permit Issued Permit # created and approved from payment.
Contractors
Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Passed: Electrical - Generator Final No Gas Inspection Matt Forsyth 3/17/2025
Release to power company Matt Forsyth 3/17/2025
Documents
File Name Date File Size