| Septic Release Inspection |
|
Health Dept |
1/3/2025 |
| Passed: Swimming Pool - Pool Steel and Ground |
|
Anthony Aslan |
1/16/2025 |
| Passed: Engineering - Setbacks |
Appears Within Setbacks |
Anthony Aslan |
1/16/2025 |
| Passed: Swimming Pool - Pool Deck/Piping Pressure |
|
Gary Pitzer |
3/13/2025 |
| Passed: Electrical - Pool/Deck Bonding |
|
Gary Pitzer |
3/13/2025 |
| Rescheduled 5/15/2025:Swimming Pool - Pool Safety and Final |
|
Gary Pitzer |
5/14/2025 |
| Cancelled: Swimming Pool - Pool Safety and Final |
|
Gary Pitzer |
5/14/2025 |
| Failed: Swimming Pool - Pool Safety and Final |
1. Bonding Wire To Pool Heater Is Broke, 2. Label Panel At Pool Equipment |
Gary Pitzer |
5/20/2025 |
| Passed: Swimming Pool - Pool Safety and Final |
Defects Corrected |
Gary Pitzer |
5/21/2025 |