Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Setbacks |
|
Gary Pitzer |
1/21/2025 |
Passed: Building - Footer |
2 # 5 Rebar Wired And On Chairs, Electrical Rebar Bond |
Gary Pitzer |
1/21/2025 |
Passed: Electrical - Temporary Service |
|
Gary Pitzer |
2/4/2025 |
Release to power company |
|
Gary Pitzer |
2/4/2025 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
Dwv Only With Clean Out On Exterior,no Water Or Gas |
Gary Pitzer |
3/17/2025 |
Passed: Electrical - 1st Underground Rough–In |
Underxlab Conduits And Floor Box |
Gary Pitzer |
3/17/2025 |
Passed: Building - Slab |
|
Gary Pitzer |
3/31/2025 |
Passed: Building - Roof Decking |
|
Gary Pitzer |
5/22/2025 |
Passed: Building - Wall Sheathing |
|
Gary Pitzer |
5/22/2025 |
Passed: Plumbing/Gas - Tub Set/Shower Pan |
|
Gary Pitzer |
6/11/2025 |
Passed: Building - Framing |
|
Gary Pitzer |
6/11/2025 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Gary Pitzer |
6/11/2025 |
Failed: Mechanical - Rough In |
Duct Not Complete, Vents From Bath Fans Not Complete |
Gary Pitzer |
6/11/2025 |
Failed: Electrical - 2nd Rough-In |
In Progress With Installation |
Gary Pitzer |
6/11/2025 |
Passed: Electrical - 2nd Rough-In |
|
Gary Pitzer |
6/16/2025 |
Passed: Mechanical - Rough In |
|
Gary Pitzer |
6/16/2025 |
Passed: Building - Insulation |
Foam Walls And Roof |
Gary Pitzer |
6/25/2025 |
Passed: Electrical - Permanent Power |
Need Septoc Release |
Anthony Aslan |
8/13/2025 |
Release to power company |
Rec'd Septic Final |
Ewilliams |
8/19/2025 |
Septic Release Inspection |
|
Health Dept |
8/19/2025 |
Failed: Building - Final |
Needs Drive Apron Completed And Passed |
Gary Pitzer |
9/29/2025 |
Passed: Building - Final |
All Requirements Met To Release Co-- 10.3.25 Mg |
Gary Pitzer |
10/3/2025 |