Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 161 SW COVEY CT
LAKE CITY, FL 32025
Parcel #: 02697-003
Acres: 5.04
Owner: Peeler Earl
Subdivision:
Zoning: RMF-2
Flood Zone: X
District: 5
Application #: 68846
Permit #: 000052017
Related Permit: Right-of-Way Access/Driveway: 000052007
Submitted: Monday, January 6, 2025
Issued: Tuesday, January 7, 2025
Expires: Wednesday, April 23, 2025
Completed: Wednesday, April 23, 2025
Status: Completed
Septic Release? Yes
Notes:

LAKE CITY UTLITY CUSTOMER SERVICE NOTES The City of Lake City does not provide utilities to this location. Locates must be obtained to ensure that the existing utility infrastructure is not damaged or obstructed.
Job Details
This is the construction of a Single Family Dwelling
Heated Area (Sqft) 1564
Total Area (Sqft) 1932
Stories 1
Building Height 15
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family dwelling
Setbacks Front 20'
Setback Side 1 10'
Setback Side 2 10'
Setbacks Rear 15'
Septic# (00-0000) or (X00-000) 24-0912
Service Amps 200
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Elevation regulation Minimum Requirement
Finished floor requirement One foot above the road
Fema map number 12023C0291D
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Review Notes
1/6/2025 City of Lake City Utilities Notified. City of Lake City Notified of Application within Utility Service Areas LC_GAS, LC_SEWER.
1/6/2025 Point Review - Received-Hard Copy Application NEEDED: *DRIVEWAY APPROVAL-- PENDING PUBLIC WORKS REVIEW
1/6/2025 Point Review - Reviewed NEEDED: *DRIVEWAY APPROVAL-- PENDING PUBLIC WORKS REVIEW
1/6/2025 Plan Review - Plumbing Approved NEEDED: *DRIVEWAY APPROVAL-- PENDING PUBLIC WORKS REVIEW
1/6/2025 Plan Review - Mechanical Approved NEEDED: *DRIVEWAY APPROVAL-- PENDING PUBLIC WORKS REVIEW
1/6/2025 Plan Review - Electrical Approved NEEDED: *DRIVEWAY APPROVAL-- PENDING PUBLIC WORKS REVIEW
1/6/2025 Plan Review - Building Approved NEEDED: *DRIVEWAY APPROVAL-- PENDING PUBLIC WORKS REVIEW
1/6/2025 Plan Review - Reviewed NEEDED: *DRIVEWAY APPROVAL-- PENDING PUBLIC WORKS REVIEW
1/6/2025 Zoning Review - Contact the Building Dept NEEDED: *DRIVEWAY APPROVAL-- PENDING PUBLIC WORKS REVIEW
1/7/2025 Zoning Review - Reviewed
1/7/2025 Final Review - Reviewed
1/7/2025 Final Review - Payment Needed
1/7/2025 Permit Issued Permit #000052017 created and approved.
4/22/2025 Final Review - Payment Needed
Contractors

This is an owner builder project.

Name/ Business License Title Role
Marcus Matthews
Matthews Electric Llc
EC13005459 Electrical Contractor Subcontractor
Harry D Moseley Sr
Harrys Heating & Air Conditioning Inc
Liability Insurance Expired.
RA0030316 Class A A/c Contractor Subcontractor
Cody Barrs
Barrs Plumbing Inc
CFC1427145 Plumbing Contractor Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Plumbing/Gas - 2nd Rough-In Troy Crews 2/11/2025
Passed: Building - Framing Troy Crews 2/11/2025
Passed: Electrical - 2nd Rough-In Troy Crews 2/11/2025
Passed: Mechanical - Rough In Troy Crews 2/11/2025
Passed: Building - Insulation Troy Crews 2/14/2025
Septic Release Inspection Health Dept 3/13/2025
Passed: Electrical - Permanent Power Troy Crews 3/24/2025
Release to power company Troy Crews 3/24/2025
Passed: Building - Final Assessments Must Be Paid Prior To Co -- 4.2.25 Troy Crews 3/24/2025
Documents
File Name Date File Size
Certificate Of Occupancy 20250423.pdf 2025.04.23 219.04kB
Peeler Termite Final.jpg 2025.03.28 398.76kB
Peeler Blower Door Test 2025-03-27 09.25.42.602.pdf 2025.03.27 323.30kB
Power Release-electrical-permanent Power 20250324.pdf 2025.03.24 38.78kB
Peeler As Built Foundation And Plumbing.pdf 2025.02.13 1.71MB
Peeler Anchor Bolts 2025-02-13 07.44.10.594.msg 2025.02.13 80.50kB
Big Plans 52017.pdf 2025.01.17 5.16MB
Product Approval Code Specifications Form 20250117 094149.pdf 2025.01.17 346.15kB
Manual J Forms 20250117 094148.pdf 2025.01.17 1.74MB
Residential Or Commercial Checklist 20250117 094049.pdf 2025.01.17 1.92MB
Septic Approval Paperwork 20250117 094048.pdf 2025.01.17 463.72kB
Subcontractor Form 20250117 094047.pdf 2025.01.17 347.18kB
Recorded Deed 20250117 093950.pdf 2025.01.17 353.57kB
Owner Disclosure Statement 20250117 093949.pdf 2025.01.17 1.12MB
Property Appraiser Parcel Details Printed Page 20250117 093949.pdf 2025.01.17 287.97kB
Recorded Deed 20250117 093948.pdf 2025.01.17 464.62kB
Floodplain Ordinance Notice To Owner 20250117 093848.pdf 2025.01.17 372.17kB
Roof Inspection Affidavit By Contractor 20250117 093849.pdf 2025.01.17 310.07kB
Owner And Contractor Signature Page 20250117 093847.pdf 2025.01.17 454.25kB
Application Information Page 20250117 093749.pdf 2025.01.17 327.66kB
Original Permit 20250107.pdf 2025.01.07 46.12kB
Approved Site Plan.pdf 2025.01.07 253.73kB
Confirmation Of Home Placement.pdf 2025.01.07 334.99kB
City Of Lake City Accessibility Letter.pdf 2025.01.06 185.72kB
Srwmd Enhanced Snapshot 68846.pdf 2025.01.06 582.50kB
161 Sw Covey Ct.pdf 2025.01.06 871.41kB