Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Mobile Home Permit
Address 169 SW DUREN PL
LAKE CITY, FL 32024
Parcel #: 00479-309
Acres: 10.05
Owner: Ramkhelawan Rajroop, Ramkhelawan Bibi
Subdivision: Southern Exposures Unr
Zoning: ESA-2
Flood Zone: X
District: 2
Application #: 68677
Permit #: 000052015
Related Permit:
Submitted: Tuesday, December 17, 2024
Issued: Tuesday, January 7, 2025
Expires: Tuesday, March 4, 2025
Completed: Tuesday, March 4, 2025
Status: Completed
Septic Release? Yes
Notes:

Job Details
Mobile Home is a: Double Wide
Year Built 2023
How many of bedrooms does this home have? 4
How many bathrooms does this home have? 2
Width (Ft.In) 32
Length (Ft.In) 56
Wind Zone? 2
Serial # FLTHLCT32243L4297AB
Installation Decal # 115972
Service Amps 200
Residential or Commercial Use? Residential
Driveway access to home: Private Driveway Permit
Are you applying for a 5 year temporary permit? No
Septic # (00-0000) or (X00-000) 24-0926
Dev Permit # F023-
Setbacks Front 30'
Setback Side 1 25'
Setback Side 2 25'
Setbacks Rear 25'
Elevation regulation Minimum Requirement
Finished floor requirement Bottom of lowest beam must be one foot above the road
Fema map number 12023C0370C
Review Notes
12/17/2024 Application pending.
12/17/2024 Application submitted by applicant.
12/26/2024 Point Review - Printed-Online Application NEEDED: *911 ADDRESS-- APPLIED FOR, PENDING DRIVEWAY APPROVAL *DRIVEWAY APPROVAL *ENV HEALTH APPROVAL-- CONTACT 386.758.1058
12/26/2024 Point Review - Reviewed NEEDED: *911 ADDRESS-- APPLIED FOR, PENDING DRIVEWAY APPROVAL *DRIVEWAY APPROVAL *ENV HEALTH APPROVAL-- CONTACT 386.758.1058
12/26/2024 Zoning Review - Reviewed NEEDED: *911 ADDRESS-- APPLIED FOR, PENDING DRIVEWAY APPROVAL *DRIVEWAY APPROVAL *ENV HEALTH APPROVAL-- CONTACT 386.758.1058
12/27/2024 Plan Review - Reviewed NEEDED: *911 ADDRESS-- APPLIED FOR, PENDING DRIVEWAY APPROVAL *DRIVEWAY APPROVAL *ENV HEALTH APPROVAL-- CONTACT 386.758.1058
12/27/2024 Final Review - Documents Required NEEDED: *911 ADDRESS-- APPLIED FOR, PENDING DRIVEWAY APPROVAL *DRIVEWAY APPROVAL *ENV HEALTH APPROVAL-- CONTACT 386.758.1058
1/3/2025 Final Review - Documents Required NEEDED: *ENV HEALTH APPROVAL-- CONTACT 386.758.1058
1/6/2025 Final Review - Documents Required NEEDED: *ENV HEALTH APPROVAL-- CONTACT 386.758.1058
1/7/2025 Final Review - Payment Needed
1/7/2025 Permit Issued Permit # created and approved from payment.
3/4/2025 Point Review - Reviewed
Contractors
Name/ Business License Title Role
Kyle Johnson
Florida Mfg Foundations Llc
IH1126657 Mh (dih) Dealer/installer Contractor
Glenn Whittington
Whittington Electric Inc
EC13002957 Electrical Contractor Subcontractor
Michael A Boland
Ace A/c Of Ocala Llc
CAC1817716 Cert Class B A/c Subcontractor
Inspections
Inspection Notes Performed By Date
Failed: Mobile Home - Mobile Home Set-Up Final East Side Of Home Has No Positive Drainage Away From The Building Also Need Septic Release To Complete Permit Matt Forsyth 2/10/2025
Passed: Engineering - Setbacks Matt Forsyth 2/10/2025
Passed: Mobile Home - Mobile Home Set-Up Final Need Septic Release To Complete Permit And Release Power Matt Forsyth 2/18/2025
Passed: Engineering - Setbacks Matt Forsyth 2/18/2025
Release to power company Melissa Garber 3/4/2025
Certificate-Release Certificate Matt Forsyth 3/4/2025
Septic Release Inspection Health Dept 3/4/2025