| Inspection |
Notes |
Performed By |
Date |
| Passed: Building - Footer |
|
Troy Crews |
1/8/2025 |
| Passed: Engineering - Setbacks |
|
Troy Crews |
1/8/2025 |
| Passed: Electrical - Temporary Service |
|
Matt Forsyth |
1/24/2025 |
| Release to power company |
|
Matt Forsyth |
1/24/2025 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
Dwv And Cpvc Water Lines, 125 Psi On Test |
Gary Pitzer |
1/29/2025 |
| Failed: Building - Slab |
Request Pictures Of Hook Bar With Clean Out That Were Filled With Dirt |
Matt Forsyth |
2/11/2025 |
| Passed: Building - Slab |
Block Cells Cleaned Out |
Matt Forsyth |
2/14/2025 |
| Passed: Building - Ext Strapping/Wall Sheathing |
Some Post Bottom Plates Fasteners Need To Be Finished |
Matt Forsyth |
3/12/2025 |
| Passed: Building - Framing |
Truss Engineering Inspected With Interior And Exterior Walls |
Matt Forsyth |
3/12/2025 |
| Passed: Building - Roof Decking |
|
Matt Forsyth |
3/12/2025 |
| Passed: Building - Wall Sheathing |
Permit Is Missing At The Box |
Matt Forsyth |
3/12/2025 |
| Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
4/3/2025 |
| Passed: Mechanical - Rough In |
|
Matt Forsyth |
4/3/2025 |
| Passed: Plumbing/Gas - 2nd Rough-In |
|
Matt Forsyth |
4/3/2025 |
| Passed: Plumbing/Gas - Tub Set/Shower Pan |
|
Matt Forsyth |
4/3/2025 |
| Passed: Building - Insulation |
Foam |
Matt Forsyth |
4/28/2025 |
| Septic Release Inspection |
|
Health Dept |
6/27/2025 |
| Passed: Electrical - Permanent Power |
Meter Can Installed Ready For Permanent Power |
Matt Forsyth |
6/30/2025 |
| Release to power company |
|
Matt Forsyth |
6/30/2025 |
| Release to power company |
Re-release |
Matt Forsyth |
7/2/2025 |
| Failed: Building - Final |
Need Final Termite Treatment Picture Of Ventilation Fans Termination Point |
Matt Forsyth |
8/22/2025 |
| Passed: Certificate-Release Certificate |
|
Matt Forsyth |
8/25/2025 |
| Passed: Building - Final |
Items Were Addressed - All Requirements Met To Release Co-- 8.25.25 Mg |
Matt Forsyth |
8/25/2025 |