Permit Details

Permit Search

Permit

New Residential Construction

235 SW STEWART LOOP
LAKE CITY, FL 32024

Permit #
000051977
Application #
68057
Status Completed
  1. Submitted Nov 11, 2024
  2. Issued Jan 3, 2025
  3. Expires Mar 23, 2026
  4. Completed Sep 26, 2025

Property

Parcel #
03159-001
Owner
Streeter J Robb, Streeter Patricia
Acres
1.84
Subdivision
Plantation Estates
Zoning
RSF-2
Flood zone
X
District
5

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Engineers Elevation Letter
Finished floor requirement
12" above adjacent ground for entire perimeter
Fema map number
12023C0381D
This is the construction of a
Single Family Dwelling
Stories
1
Heated Area (Sqft)
1560
Total Area (Sqft)
3032
Building Height
22
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
24-0891
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - On Hold-Incomplete
  4. Point Review - On Hold-Incomplete
  5. Point Review - Printed-Online Application
  6. Point Review - Reviewed
  7. Zoning Review - Corrections Needed
  8. Plan Review - Plumbing Approved
  9. Plan Review - Mechanical Approved
  10. Plan Review - Electrical Approved
  11. Plan Review - Building Approved
  12. Plan Review - Reviewed
  13. Zoning Review - Corrections Needed
  14. Zoning Review - Reviewed
  15. Final Review - Documents Required
  16. Final Review - Documents Required
  17. Final Review - Payment Needed
  18. Permit Issued
  19. Final Review - Payment Needed
  20. Final Review - Complete

Contractors

  • Ronnie Edenfield

    Scci Inc

    License
    CBC1267457
    Title
    Cert. Building
    Role
    Contractor
  • Don C Bills Sr

    Hometown Plumbing Services Llc

    License
    CFC1428890
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Ralph W Laverdure

    Rwl Roofing Llc

    License
    CCC1328590
    Title
    Roofing Contractor
    Role
    Subcontractor

    County License & State License & Liability Insurance & Workers Comp Expired.

  • Donald Davis

    High Springs Electric Inc

    License
    EC0002306
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Donald R Davis

    High Springs Electric Inc

    License
    CAC1815367
    Title
    Class B A/c
    Role
    Subcontractor

Inspections

  1. Feb 11, 2025

    Failed: Building - Footer

    Not Ready

    Inspected by Gary Pitzer

  2. Feb 11, 2025

    Passed: Engineering - Setbacks

    Inspected by Gary Pitzer

  3. Feb 11, 2025

    Passed: Electrical - Temporary Service

    Inspected by Gary Pitzer

  4. Feb 11, 2025

    Release to power company

    Inspected by Gary Pitzer

  5. Feb 11, 2025

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Dwv Onl,no Water ,no Clean Out

    Inspected by Gary Pitzer

  6. Feb 24, 2025

    Passed: Building - Slab

    2#55 Rebar, Plastic Taped, Electric Steel Bond

    Inspected by Gary Pitzer

  7. Mar 18, 2025

    Passed: Building - Roof Decking

    Inspected by Gary Pitzer

  8. Mar 18, 2025

    Passed: Building - Wall Sheathing

    Inspected by Gary Pitzer

  9. Mar 18, 2025

    Cancelled: Building - Ext Strapping/Wall Sheathing

    Inspected by Emaleigh Williams

  10. Mar 20, 2025

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Gary Pitzer

  11. Apr 11, 2025

    Passed: Building - Framing

    Inspected by Gary Pitzer

  12. Apr 11, 2025

    Passed: Electrical - 2nd Rough-In

    Inspected by Gary Pitzer

  13. Apr 11, 2025

    Passed: Mechanical - Rough In

    Inspected by Gary Pitzer

  14. Apr 11, 2025

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Gary Pitzer

  15. May 2, 2025

    Passed: Building - Insulation

    Main Part Of House Is Foam In Walls And Roof, Garage Is Foam Roof And Batts In Walls

    Inspected by Gary Pitzer

  16. Aug 1, 2025

    Passed: Electrical - Permanent Power

    Septic Rec'd-- Ok To Release Power

    Inspected by Anthony Aslan

  17. Aug 6, 2025

    Septic Release Inspection

    Inspected by Health Dept

  18. Aug 11, 2025

    Release to power company

    Inspected by Ewilliams

  19. Sep 24, 2025

    Passed: Building - Final

    Inspected by Gary Pitzer

Documents